Installing the hardware
–You must ensure that the safety mechanisms on the server, e.g. stoppers or retaining systems, are functioning correctly.
–The shape of the rack support uprights must ensure that the support systems can be bolted to the front.
The support systems have a linear alignment feature to ensure that they can be adjusted to different rack depths.
–No cable management support (delivered with the mounting kit).
–Climatic conditions:An unobstructed air intake in the rack front and air discharge in the rear cover of the rack are essential for ventilation of the installed server.
In general, the ventilation concept ensures that the necessary cooling is achieved by the horizontal
–Power supply:For installation in 3rd party racks, you must ensure that the appropriate socket strips are present.
4.4.2Installation in the rack
For installation in a PRIMECENTER/DataCenter rack, the following parts are required:
–Two
–Two carrier rails (mounted)
–Two
IGeneral information regarding server installation in the rack is included in the technical manual for the appropriate rack.
When mounting the left carrier rail in the PRIMECENTER/DataCenter rack, the supplied support bracket must first be mounted on the rear left support upright flush with the bottom edge of the device.
ÊRead the installation guide in the technical manual for the corresponding rack.
ÊMark the position of the bottom edge of the system unit on the support uprights.