Important notes

3.4Notes on installation into the rack

VCAUTION!

For safety reasons, at least two people are required to install the system unit in the rack because of its weight and size.

(For the Japanese market, please refer to " 安全上のご注意 ".)

Before lifting the system unit, remove all server blades, storage blades, connection blades, management blades, all power supply units, fan units and dummy modules to reduce the weight.

To lift or carry the system unit, always use the handles on the long sides.

Never lift or carry the system unit by the handles on the front or back of the unit.

For safety reasons, no more than one unit may be removed from the rack at any one time during installation or maintenance work.

Make sure that the anti-tilt plate is correctly mounted when you set up the rack.

The rack may tip over if more than one unit is removed at the same time.

Before connecting or disconnecting cables, read the notes in the chapter "Important Notes" in the technical manual for the relevant rack. The technical manual for the rack is supplied with the rack.

The rack must be connected to the mains by an authorized specialist (electrician).

If the server system is integrated in a rack installation that receives power from an industrial (public) power supply network with the IEC309 connector, the (public) power supply protection must comply with the requirements for the non-industrial (public) power supply networks for the type A connector.

The power supply for the rack should be distributed over the three phases of a three-phase mains connection.

34

Operating Manual

BX400 S1

Page 34
Image 34
Fujitsu BX400 S1 manual For the Japanese market, please refer to 安全上のご注意