14 Push the two levers (green) towards each other to disengage with the lower locking holes and lift them up until they engage with the two upper locking holes.

15 Connect the two relay connectors on the roller ASY.

16 Close the upper transport

unit. (See page 4-2)

Pad Replacement Replace the pad as follows:

WARNING

Wait at least 3 minutes after turning off the power before replacement.

Upper transport unit

Operator panel

1

Turn off the power switch.

 

 

 

 

Make sure that the hopper

 

 

 

table is at the bottom.

 

 

2

Open the upper transport

 

 

 

unit. (See page B-2)

BASIC OPERATION

Lever

Power switch

3 Disconnect the two relay

connectors on the roller

Lever (green)

Roller ASY

ASY.

4 Push the two levers (green)

towards each other to

disengage with the upper

locking holes and lower

down the two levers until

they engage with the two

levers locking holes.

M3099GX/GH OEM Manual

4-21