68K System Monitor
GE Energy ServicesUser's Guide
TEST - Invoke Test Tool
Platform | o | CPM | D20 | D20 ME | D20/200 | D20/200 ME | þ | D25 |
|
| o D20 Base | o D20 Base | o CCU Base | þ CCU Base |
| ||
|
|
|
| |||||
Description | Use this command to activate a test tool external to the monitor. |
|
|
To use a test tool, the test tool application must:
•be included in the software for the system, and
•be created specifically to make use of this monitor function.
The 68K Monitor relinquishes communications control to the test tool and waits for the tool to complete its processing before continuing.
Syntax | Below is usage and syntax information for this command |
| ||
|
|
|
|
|
|
| Command Format | test proc_name |
|
|
|
|
|
|
|
| Variables | None |
|
|
|
|
|
|
|
| Parameters | proc_name = The name of the test tool process, normally |
|
|
|
| Txxx. |
|
|
|
|
|
|
|
| Example | None Required |
|
|
|
|
|
|
|
| Special | If the test tool application is suspended, the command will not |
|
|
| Considerations | function. |
|
|
|
| The monitor must detect that the test tool is waiting for a signal |
|
|
|
| before it will proceed. |
|
|
|
|
|
|
|
|
|
|
|
SWM0023 1.00 2 | General |
Full Release | |
|