
| 
 | 68K System Monitor | 
| GE Energy Services | User's Guide | 
| 
 | 
 | 
ST - Serial Test
Platform
Description
Syntax
| þ CPM þ D20 | þ D20 ME | þ D20/200 | þ D20/200 ME | þ D25 | 
| D20 Base | D20 Base | CCU Base | CCU Base | 
 | 
Use this command to start one of these two serial port test procedures:
•an automatic 
−transmits and receives a series of characters of different formats.
•manually forcing the mark or space line states from the 
−allows you to monitor and adjust modem levels or frequencies.
Below is usage and syntax information for this command
| Command Format | CPM / D20: | 
 | st /(f l) port | |
| 
 | CCU / CCUME / D25: | st /(f l) port [baud] | ||
| 
 | 
 | 
 | 
 | |
| Variables | /f | = | force mark or space states | |
| 
 | /l | = | automatic  | |
| 
 | 
 | 
 | 
 | |
| Parameters | port | = | serial port to test (COM#) | |
| 
 | baud | = | data rate in bps (decimal) | |
| 
 | 
 | |||
| Example | Type st /l com7 9600 and press ENTER. | |||
| 
 | Results: This forces the  | |||
| 
 | 
 | communications port seven (7) to perform the loop- | ||
| 
 | 
 | back test at 9600 bps. | ||
| 
 | 
 | The system displays the current state of the test. | ||
| 
 | 
 | Cancel the force test manually with  | ||
| 
 | 
 | The  | ||
| 
 | 
 | completion of the test. The monitor displays the | ||
| 
 | 
 | prompt after stopping either test. | ||
| 
 | 
 | |||
| Special | • These tests temporarily assume control of the specified | |||
| Considerations | communications port, and disrupt any current activity. | |||
| 
 | • They may also, depending on the application, affect | |||
| 
 | subsequent operation. | 
 | ||
| 
 | To ensure that you avoid this, you must reboot the system | |||
| 
 | when you complete all testing. | |||
| 
 | 
 | 
 | 
 | 
 | 
Continued on next page
| SWM0023 1.00 2 | General | 
| Full Release | |
| 
 | 
