Installation of Two Pipe Venting – Vertical

Refer to the diagram below for venting on vertical concentric systems. The combustion air pipe must terminate at least 12 inches above the roof. This clearance may need to be increased to accommodate for snow accumulation. The exhaust must terminate at least 12 inches above and 12 inches horizontally from the combustion air inlet.

Exhaust Vent

C

Combustion

Terminal

Air Inlet

 

Terminal

B

 

 

A

Roof Line

 

EXHAUST

COMBUSTION AIR

D

 

 

Tee with

D

drip leg and

clean-out cap

A = 12 inch minimum, but should size according to expected snow depth

B = 24 inch minimum C = 12 inch minimum D = 12 inch minimum

Vent Connection Diameter

Vent terminals must be used. Construct the vent system as shown in the drawings and refer to the table for the correct vent connection diameters.

Furnace Size

Exhaust

Combustion

(MBH)

(inches)

(inches)

 

 

 

75 - 175

4

4

 

 

 

200 - 400

6

6

 

 

 

Vent Length

Refer to table for minimum and maximum vent lengths. The minimum vent length is 10 feet and the maximum vent length is 70 feet. The total equivalent vent length must include elbows. The equivalent length of a 4 inch elbow is 6 feet and the equivalent length of a 6 inch elbow is 10 feet.

Vent

Minimum

Maximum

Length

(feet)

(feet)

 

 

 

Vertical

10

70

 

 

 

1. Install Exhaust Pipe

Run an exhaust pipe from the unit’s combustion exhaust through the roof to the outdoors. The exhaust pipe must terminate at least 12 inches above the outside surface of the roof. This clearance may need to be increased to accommodate snow accumulation. Attach the exhaust vent terminal to the end of the exhaust pipe.

2. Install Combustion Air Pipe

Run a combustion air pipe from the unit’s combustion air intake through the roof to the outdoors. The combustion air pipe must terminate at least 12 inches horizontally and vertically from the combustion exhaust pipe and at least 24 inches from the exterior surface of the roof. These clearances may need to be increased to accommodate for expected snow accumulation. Attach the combustion air terminal to the end of the combustion air pipe.

3. Seal Roof Penetration

Using an appropriate method, seal the roof openings around the vent pipes.

INTAKE END

Exhaust Connection

Exhaust Connection

(Model IGX)

(Model IG)

DISCHARGE

END

Combustion Air Connection

Combustion Air Connection

(Model IGX)

(Model IG)

14 Model IG / IGX Make-Up Air

®

Page 14
Image 14
Greenheck Fan 470656 manual Installation of Two Pipe Venting Vertical, Seal Roof Penetration