Greenheck Fan 470656 manual Reference - Start-UpChecklist

Models: 470656

1 72
Download 72 pages 41.99 Kb
Page 71
Image 71
Reference - Start-Up Checklist

Reference - Start-Up Checklist

Start-Up Checklist

 

 

Unit Model Number

____________________________

(e.g. IGX-120-H32-DB)

Unit Serial Number

____________________________

(e.g. 10111000)

Start-Up Date

____________________________

 

Start-Up Personnel Name

____________________________

 

Start-Up Company

____________________________

 

Phone Number

____________________________

 

Pre Start-Up Checklist - check boxes as items are completed

oCheck tightness of all factory wiring connections

oVerify control wiring wire gauge

oHand-rotate blower to verify free rotation

oVerify supply voltage to the main disconnect

oVerify the supply gas pressure

oVerify remote controls wiring

Start-Up Blower Checklist - refer to Blower Start-Up section for further detail

o Check line voltage

L1-L2_ _________________ L2-L3 _______________ L1-L3________________

oCheck blower rotation

oCheck for vibration

o

Supply fan RPM

 

______________

RPM

 

o

Motor nameplate amps

 

______________

Amps

 

o

Actual motor amps

 

______________

Amps

 

o

Actual CFM delivered

 

______________

CFM

 

Optional Accessories - refer to Blower Start-Up section, Step #6 for further detail

 

o

Heating inlet air sensor

 

______________

Actual Setting

(Typical Setting 60-70ºF)

o

Cooling inlet air sensor

 

______________

Actual Setting

(Typical Setting 75ºF)

o

Building freeze protection

 

______________

Actual Setting

(Typical Setting 5 min; 45ºF)

o

Dirty filter gauge

 

______________

Actual Setting

(Typical Setting varies)

Start-Up Indirect Gas - refer to Furnace Start-Up section for further detail

 

Furnace 1

 

 

 

 

 

o

Determine furnace control type

_

1 Stage - 2 Stage - 8 Stage - 2:1 Mod. - 4:1 Mod.

o

Check supply gas pressure ______________ Maximum

___________ Minimum

_ __________ Actual

o

Set the High Manifold pressure

 

______________

in. wg

 

o

Set the Low Manifold pressure

 

______________

in. wg

 

o

Set the unit’s operating temperature

______________

degrees F

 

Furnace 2 (Optional)

 

 

 

 

 

o

Determine furnace control type

_

1 Stage - 2 Stage - 8 Stage - 2:1 Mod. - 4:1 Mod.

o

Check supply gas pressure _____________ Maximum

___________ Minimum

_ __________ Actual

o

Set the High Manifold pressure

 

______________

in. wg

 

o

Set the Low Manifold pressure

 

______________

in. wg

 

Furnace 3 (Optional)

 

 

 

 

 

o

Determine furnace control type

_

1 Stage - 2 Stage - 8 Stage - 2:1 Mod. - 4:1 Mod.

o

Check supply gas pressure _____________ Maximum

___________ Minimum

_ __________ Actual

o

Set the High Manifold pressure

 

______________

in. wg

 

o

Set the Low Manifold pressure

 

______________

in. wg

 

®

Model IG / IGX Make-Up Air 71

Page 71
Image 71