Meridian America Link/Customer Controlled Routing manual Meridian 1 software checklists

Models: Link/Customer Controlled Routing

1 595
Download 595 pages 8.52 Kb
Page 112
Image 112

94Chapter 6: Site survey/installation checklist

Loading equipment required

Responsible party: _____________________________________________

Delivery constraints: ____________________________________________

Elevator capacity: ______________________________________________

Equipment delivery route to the equipment room: _____________________

_____________________________________________________________

Meridian 1 software checklists

To check the Meridian 1 software, use the Meridian 1 Overlay program 22 (LD 22) and obtain a printout of:

¥the current software issue (ISS) and package list (PKG) as outlined in the Generic X11 Input/output Guide (NTP 553-001-400). Compare the printout with the following requirements and checklists.

¥the ADAN information which will be required when setting physical card address switches on the ESDI (QPC513G) or MSDL card.

¥the tape ID (TID) which will be required when installing the Meridian Link/CCR application. Use this information when prompted to enter your Meridian 1 ID.

553-3202-210 Standard October 1998

Page 112
Image 112
Meridian America Link/Customer Controlled Routing manual Meridian 1 software checklists, Loading equipment required