Meridian America Link/Customer Controlled Routing manual Unpack and inspect hardware, 115

Models: Link/Customer Controlled Routing

1 595
Download 595 pages 8.52 Kb
Page 133
Image 133

115

Chapter 7: Unpack and inspect hardware

You should use this chapter in conjunction with Chapter 5, ÒHardware installation overview,Ó which links hardware installation procedures in easily understood tables (Tables 11 and 12).

This chapter provides information on receiving, unpacking, and inspecting the IPE Module and Application Module hardware components.

When handling the equipment during receiving, unpacking, and inspection, use the following precautions:

¥Do not drop circuit packs.

¥Do not remove circuit packs from their shipping container until they are ready to be inserted.

¥Handle circuit packs by their edges or faceplate.

¥Do not touch the components on the printed circuit board.

¥Set static-sensitive circuit packs down only on the antistatic bag supplied in the shipping container.

¥Do not stack circuit packs on top of each other.

¥Do not insert or remove circuit packs unnecessarily.

¥Do not attempt field repairs of circuit packs.

¥Store circuit packs in a spare shelf or side-by-side in their shipping containers.

Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide

Page 133
Image 133
Meridian America Link/Customer Controlled Routing manual Unpack and inspect hardware, 115