Meridian America Link/Customer Controlled Routing manual Equipment room cooling conditions

Models: Link/Customer Controlled Routing

1 595
Download 595 pages 8.52 Kb
Page 130
Image 130

112Chapter 6: Site survey/installation checklist

Equipment room cooling conditions

Use this list to note the conditions in the equipment room.

¥Type: ____________________________________________________

¥Ambient temperature: _______________________________________

¥Humidifier/air conditioner: ___________________________________

¥Customer restrictions: _______________________________________

__________________________________________________________

__________________________________________________________

¥Notes on current environmental conditions: _______________________

__________________________________________________________

__________________________________________________________

Additional considerations

Use the following checklist to check for additional considerations.

Table 27

Additional considerations

Additional considerations

Yes

No

Does the existing PBX installation conform to

NTP and Product Bulletins?

Does the end user have any complaints with existing PBX?

Does the end user have any complaints with existing Meridian Mail system?

Does the end user have any complaints with existing Auxiliary system?

553-3202-210 Standard October 1998

Page 130
Image 130
Meridian America Link/Customer Controlled Routing manual Equipment room cooling conditions, Additional considerations