386Chapter 14: Software installation, upgrade, and update procedures

If the release or issue of BOS changes,

¥Perform Procedure 2: Start the update process.

¥Depending on the type of SBC card installed, perform one of the following:

ÑProcedure 5: Load the operating system tape on an Application Module with an MVME147 card

ÑProcedure 6: Load the operating system tape on an IPE Module or an Application Module with an MVME167 card

¥Perform Procedure 7: Reboot and go through setup.

¥Perform Procedure 8: Load the application software from tape.

¥Perform Procedure 9: Restore configuration files and data files from the backup tape to customize your system.

¥Perform Procedure 10: Verify the installation to confirm that the installation is complete and correct.

¥Perform Procedure 11: Back up configuration files and data files to back up the customized new release.

If the release or issue of BOS does not change,

¥Perform Procedure 2: Start the update process.

¥Perform Procedure 3: Load application software from tape.

Section 15: Activating or de-activating a Meridian Link or CCR feature

If you wish to activate or de-activate a feature (for example, you wish to activate Ethernet LAN support), perform Procedure 1: Application configuration and start-up.

Section 16: To install or reinstall the software from tape

If you must install or reinstall the software from tape (for example, after replacing the hard drive), change the serial number, change the subnet mask, change the default router address, or activiate or de-activate features using the keycode, do the following:

¥Perform Procedure 4: Power down the IPE Module or the Application Module.

553-3202-210 Standard October 1998

Page 404
Image 404
Meridian America Link/Customer Controlled Routing manual Activating or de-activating a Meridian Link or CCR feature