viiiContents

Chapter 7: Unpack and inspect hardware

115

Receiving the IPE Module and Application Module

 

 

components

116

Unpacking the IPE Module and Application Module

 

 

components

117

 

 

 

Chapter 8: Hardware installation procedures

119

Installing the IPE Module

120

Installing the Application Module

125

Installing the power supply and disk/tape unit

127

Checking the card option settings (Application Module)

129

Installing an NTAK02 SDI/DCH card

142

Installing an ESDI or MSDL card

145

 

 

Chapter 9: Meridian Link/CCR interface cabling 151

IPE Module cabling

151

IPE Module cables

151

External I/O cables

154

External I/O cable pinouts (IPE Module)

155

Cabling the Option 11 IPE Module to external equipment

177

Cabling to external equipment

177

Backplane cable rerouting for Options 21Ð81 CE/PE and IPE

 

backplanes

185

Backplane cable rerouting for the NT8D11 CE/PE Module

 

backplane

187

Backplane cable rerouting for NT8D37 IPE Module

195

Cabling the Options 21Ð81 IPE Module to external equipment 209

Application Module cabling

216

Power cables

216

Input/output cables

219

Cabling the Application Module to external equipment

227

Installing Ethernet LAN support

256

553-3202-210 Standard October 1998

Page 8
Image 8
Meridian America Link/Customer Controlled Routing Unpack and inspect hardware 115, Hardware installation procedures 119