18CHAPTER 2: INSTALLING THE SERVER LOAD BALANCER

Package Contents Your shipping container should contain the following items:

Server Load Balancer (3C11620)

or Server Load Balancer Plus (3C11621)

User Guide (this guide)

Power Cord

2 x mounting brackets

6 x screws

4 x rubber feet

Choosing a Suitable The Server Load Balancer is suited for use where it can be mounted in a

Sitestandard 19-inch equipment rack, or free-standing. A rack-mounting kit, containing two mounting brackets and six screws is supplied with the unit.

CAUTION: Ensure that the ventilation holes are not obstructed.

When deciding where to position the Server Load Balancer, ensure that:

Cabling is located away from sources of electrical noise such as radios, transmitters and broadband amplifiers.

Cabling is located away from power lines and fluorescent lighting fixtures

The Server Load Balancer is accessible and cables can be connected easily.

Water or moisture cannot enter the case of the Server Load Balancer.

Air-flow is not restricted around the Server Load Balancer or through the vents in the side of the Server Load Balancer. 3Com recommends that you provide a minimum of 25 mm (1 in.) clearance.

The air is as free from dust as possible.

No more than four Server Load Balancer units are placed on top of one another, if the units are free-standing.

Temperature operating limits are not exceeded. It is recommended that the unit is installed in a clean, air conditioned environment.

Ensure there is adequate clearance at the front of the unit to ensure that the fibers are not damaged as they have a restricted bend radius.

Page 18
Image 18
HP SuperStack 3 Load Balancer Appliance manual Installing the Server Load Balancer