PROCEDURE 10 | WIRING HARNESS |
|
|
This Procedure includes the following:
WRemoving/Installing the Wiring Harness
IAdjusting Limit Switch
R
IWARNING
NAfter ANY adjustments, repair or service and BE- G FORE use, make sure that all attaching hardware
His tightened securely - otherwise injury or dam-
Aage may result.
R
NREMOVING/INSTALLING THE E WIRING HARNESS (FIGURE 1)
SNOTE: This procedure is for the FWD and MWD
Smodels ONLY. For the removing and installing the wir- ing harness on the Arrow FWD refer to REMOVING/ INSTALLING WIRING HARNESS in PROCEDURE
17of this manual.
Removing
1.Removethebatterybox(es).RefertoINSTALLING/RE- MOVINGGROUP24 BATTERYBOXESorINSTALL- ING/REMOVINGGROUP24 BATTERYBOXinPRO- CEDURE 9 of this manual.
2.Perform one (1) of the following:
For Group 24 Batteries - remove the two mounting screws and locknuts that secure the wiring harness bracket to the base frame (DETAIL “A”).
For Group 22 Batteries - cut the tie wrap that se- cures the rear portion of the wiring harness and joy- stick cable to the rear of the seat frame (DETAIL“B”).
3.Perform one (1) of the following sections:
4.Disconnectthebatteryharness/chargercable(BLUE) from the controller connector (BLUE).
5.Remove the two mounting screws that secure the charger cable to the mounting bracket.
6.Remove the wiring harness.
Installing
1.For Group 24 Batteries Only - Install NEW wir- ing harness w/bracket to the rear of the
2.For Group 22 and Group 24 Batteries - Secure the charger cable to the mounting bracket with the two (2) mounting screws. Securely tighten (DE- TAIL “C” OR “D”).
3.For Group 22 and Group 24 Batteries - Con- nect the battery harness/charger cable (BLUE) to the controller connector (BLUE) (DETAIL “C” or “D”).
4.Perform one (1) of the following sections:
SECOND GENERATION WHEELCHAIRS WITH MOTOR/GEARBOX ASSEMBLY
A.For Group 22 and Group 24 Batteries - Group the two (2) motor/controller connections together along with the controller/wiring har- ness connection (BLUE) and secure with TIE- WRAPS A and B (DETAIL “C”).
B.For Group 22 and Group 24 Batteries - Se- cure the Wiring Harness Cable, Battery Charger Cable, Controller Connector Cable, and Motor Connector Cable to the suspension arm with
SECOND GENERATION WHEELCHAIRS WITH MOTOR/GEARBOX ASSEMBLY
A.Cut
B.Cut
SECOND GENERATION WHEELCHAIRS WITH GEARLESS/BRUSHLESS MOTOR
A.Cut
NOTE: For STEPS
SECOND GENERATION WHEELCHAIRS WITH GEARLESS/BRUSHLESS MOTOR OPTION:
A.For Group 22 and Group 24 Batteries - Se- cures the battery charger cable to the base frame with
5.For Group 22 Batteries Only -
6.Reinstall the battery box(es). Refer to INSTALLING/ REMOVING GROUP 24 BATTERY BOXES or IN-
STALLING/REMOVING GROUP22 BATTERYBOX in PROCEDURE 9 of this manual.
50