TABLE 25
COOLING OPERATING SEQUENCE
SLP98DFV and Two−Stage Outdoor Unit
OPERATING |
|
| SYSTEM DEMAND |
|
| SYSTEM RESPONSE | |||||
SEQUENCE |
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Demand |
|
| Relative Humidity |
| Blower |
| ||
System |
|
|
|
|
|
|
|
|
|
| |
Step | 1st | 2nd |
|
|
|
|
| Compressor | CFM | Comments | |
Condition |
| O | G | Status | D* | ||||||
| stage | stage |
|
| (COOL) |
| |||||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
NO CALL FOR DEHUMIDIFICATION |
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
Normal Operation − | 1 | On |
|
| On | On | Acceptable | 24 | Low | 70% |
|
Y1 |
|
| VAC | Compressor and indoor | |||||||
|
|
|
|
|
|
|
|
|
|
| blower follow thermostat |
Normal Operation − |
|
|
|
|
|
|
| 24 |
|
| |
2 | On | On |
| On | On | Acceptable | High | 100% | demand | ||
Y2 |
| VAC | |||||||||
|
| ||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
ROOM THERMOSTAT CALLS FOR FIRST STAGE COOLING
BASIC MODE (only active on a Y1 thermostat demand)
Normal Operation | 1 | On |
| On | On | Acceptable | 24 | Low | 70% | Thermostat energizes | |
| VAC | ||||||||||
| 2nd stage and de−ener- | ||||||||||
|
|
|
|
|
|
|
|
|
| ||
Dehumidification | 2 | On | On | On | On | Demand | 0 | High | 70% | gizes D on a call for de− | |
humidification | |||||||||||
Call | VAC | ||||||||||
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
PRECISION MODE (operates independent of a Y1 thermostat demand)
Normal Operation | 1 | On |
| On | On | Acceptable | 24 | Low | 70% |
| |
| VAC | Dehumidification mode | |||||||||
|
|
|
|
|
|
|
|
|
| begins when humidity is | |
Dehumidification |
|
|
|
|
|
| 0 |
|
| ||
2 | On | On | On | On | Demand | High | 70% | greater than set point | |||
call | VAC | ||||||||||
| |||||||||||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Thermostat will keep out- | |
|
|
|
|
|
|
|
|
|
| door unit energized after | |
Dehumidification | 1 | On | On | On | On | Demand | 0 | High | 70% | cooling temperature set- | |
call ONLY | VAC | point has been reached | |||||||||
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
| in order to maintain room | |
|
|
|
|
|
|
|
|
|
| humidity setpoint.* | |
|
|
|
|
|
|
|
|
|
|
|
ROOM THERMOSTAT CALLS FOR FIRST AND SECOND STAGE COOLING
BASIC MODE (only active on a Y1 thermostat demand)
Normal Operation | 1 | On | On | On | On | Acceptable | 24 | High | 100% | Thermostat energizes | |
VAC | |||||||||||
2nd stage and de−ener- | |||||||||||
|
|
|
|
|
|
|
|
|
| ||
Dehumidification | 2 | On | On | On | On | Demand | 0 | High | 70% | gizes D on a call for de− | |
humidification | |||||||||||
Call | VAC | ||||||||||
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
PRECISION MODE (operates independent of a Y1 thermostat demand)
Normal Operation | 1 | On |
| On | On | Acceptable | 24 |
| Low |
| 70% |
|
| VAC |
|
| Dehumidification mode | ||||||||
|
|
|
|
|
|
|
|
|
|
|
| begins when humidity is |
Dehumidification |
|
|
|
|
|
| 0 |
|
|
|
| |
2 | On | On | On | On | Demand |
| High |
| 70% | greater than set point | ||
call | VAC |
|
| |||||||||
|
|
| ||||||||||
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
Dehumidification | 1 | On | On | On | On | Demand | 0 |
| High |
| 70% |
|
call ONLY | VAC |
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
| Thermostat will keep out- |
| On−board links at indoor unit with a two−stage outdoor unit: |
|
|
| door unit energized after | |||||||
| Cut factory link from Y1 to Y2 or cut W915 (Y1 to Y2) on SureLight® inte- | cooling temperature set- | ||||||||||
| grated control. |
|
|
|
|
|
|
|
|
| point has been reached | |
| With Condensing unit − Cut W914 (R to DS) on SureLight® integrated control; | in order to maintain room | ||||||||||
| With Heat Pump − Cut W914 (R to DS) & W951 (R to O) on SureLight® |
| humidity setpoint. | |||||||||
| integrated control. |
|
|
|
|
|
|
|
|
| ||
| *ComfortSense® 7000 thermostat only |
|
|
|
|
|
|
Page 44