|
|
|
| Table of Contents |
|
|
|
| Table of Contents |
|
|
|
|
|
|
| |
| 1. | Basic information and precautions |
| ||
| 1.1 | Important precautions |
| ||
| 1.2 | Product Details |
| ||
| 1.3 | Removal and reinstallation |
| ||
|
|
|
|
|
|
| 2. |
| Installation |
| |
| 2.1 | Installation precautions |
| ||
| 2.2 | Dimensions |
| ||
|
|
|
|
|
|
| 3. |
| Wiring |
| |
| 3.1 | Terminal wiring |
| ||
| 3.2 | Specifications for power terminal block wiring |
| ||
| 3.3 | I/O terminal block specification |
| ||
| 3.4 | PNP/NPN selection and connector for communication option |
| ||
|
|
|
|
|
|
| 4. |
| Basic configuration |
| |
| 4.1 | Connection of peripheral devices to the inverter |
|
4.2Recommended MCCB, Earth leakage circuit breaker (ELB) and Magnetic contactor specification .
4.3 | Recommendable AC/DC Reactor | |
|
|
|
5. | Programming Keypad | |
5.1 | Keypad features | |
5.2 | ||
5.3 | Moving to other groups | |
5.4 | How to change the codes in a group | |
5.5 | Parameter setting method | |
5.6 | Monitoring of operation status | |
|
|
|
6. | Basic operation | |
6.1 | Frequency Setting and Basic Operation | |
|
|
|
7. | Function list |
v |