
ECM Upgrade Procedures 31
3Enter the root user password when prompted.
4Execute the following script:
/opt/nortel/isclient/setup_ssha.sh deconfig
5If a Backup ECM Security server is present in the system, switch user to the root account and execute the script
/opt/nortel/isclient/failOver.sh <FQDN of Primary ECM Security Server>
where <FQDN of Primary ECM Security Server> is set to the FQDN of the Primary ECM Security server.
6Wait for two minutes after the command completes before proceeding.
7Switch user back to the nortel account by typing exit.
8Perform the “Upgrading Nortel Linux base ” (page 54) procedure up to and including Step 14.
9Switch user to the root account and disable network connectivity to the TLAN ethernet port with the command:
ifconfig eth1 down
WARNING
This shuts down the eth1 port.
10When complete, switch back to the nortel account.
11Continue with Step 15 of the “Upgrading Nortel Linux base ” (page 54) procedure.
12Open a command line interface session to the Primary ECM Security Server through the serial port with the nortel account.
13Install the following patches onto the Primary ECM Security server using the “Patching Operation” (page 106) procedure.
•MPLR25520
•MPLR25521
This procedure describes upgrading the Backup ECM Security server from Rls 5.00 to Rls 5.50.
Upgrade Backup ECM Security server
Nortel Communication Server 1000
Linux Platform Base and Applications Installation and Commissioning
29 October 2008