Paradyne Hotwire 7984 manual Send and Monitor, Procedure

Models: Hotwire 7984

1 122
Download 122 pages 48.4 Kb
Page 63
Image 63
Send and Monitor 511

Testing

Send and Monitor 511

The LTU initiates the test by sending a command to the remote unit to send a 511 test pattern. When the remote unit detects the command, it sends a

511 pattern and lights the front panel test LED. Each unit will send and monitor the 511 pattern. The duration and results of the test are displayed on the Network Test screen of each unit.

NOTE:

The send and monitor test is not a loopback test. Each unit independently sends and monitors a 511 pattern.

AIS

LIU

T1

Framer

CAP

Framer

CAP

511

Gen

511

Mon

Transceiver

511

Pattern

511

Pattern

CAP

511

Mon

511

Gen

Transceiver

CAP

Framer

T1

Framer

LIU

AIS DSX-1 Port

98-16108

"Procedure

To run a Send and Monitor 511 test:

1.Position the cursor at the Start command next to Send and Monitor 511 on the Network Tests screen.

2.Press Enter.

The Start command is changed to Stop.

3.To manually stop the test, verify that the cursor is positioned at the Stop command.

4.Press Enter.

When a Send and Monitor 511 test is active, a count of bit errors is displayed next to the test duration, and the ResetMon virtual function key is available for use. Type r or R or select the ResetMon virtual function key to reset the error count.

7984-A2-GB20-10

February 1999

5-7

Page 63
Image 63
Paradyne Hotwire 7984 manual Send and Monitor, Procedure