3.Release the clasp locks at the bottom, and lift the MGC-100 top cover.

Wood Packing Case

Foam Block

Foam Block

Figure 2-2: Unpacking the MGC-100

4.Lift the MGC-100 unit and remove the packaging material.

5.Lower the MGC-100 unit, placing it on the surface.

If the MGC-100 is a standalone unit, place it on a flat surface. If you are rack mounting the MGC-100, allow a minimum clearance of 3” above the unit. If you are rack mounting the NEBS MGC-100, the 3” above the unit is not needed. Refer to the NEBS Standards for clearance compliance.