MGC Hardware and Installation Manual

Clocking

To be able to work with the network connected to the MCU you need to synchronize the system clock with the network clock. This is done in two steps:

Selecting the network type according to which the system clock will synchronize. Only one system type may be selected for clocking. The clock source is then defined in the “system cfg”.

Selecting the spans of the selected network that will act as Master and Backup clocks. The Master and the Backup clock must be set on spans of the same network type.

For more details regarding the clocking setup, see the MGC Administrator’s Guide, “Clocking” in Chapter 5.

You have completed the hardware installation. The next step in the installation procedure is to install the MGC Manager software. For more information, refer to the MGC Administrator’s Guide, Chapter 2.

2-41

Page 63
Image 63
Polycom MGC-50/MGC-100 installation manual Clocking