Chapter 2 - Hardware Installation

5.Carefully rotate the MGC-100 counterclockwise 90°, making sure the Control Unit is at the bottom left.

6.While supporting the MGC-100, place it on the 19” rack and screw the brackets to the rack, securing it with the screws and nuts supplied with the rack.

NEBS Standard

For installations based within the United States, an MGC-100 DC NEBS compliant system is available. The NEBS compliant systems differs in its construction of the frame and the power supply. All else remains the same.

The construction of the MGC-100 is 12 U’s, (1 U = 4.3 cm) which makes it higher by 3 U’s than the original frame of the MGC-100. This design allows for a cushion of air to be present, ensuring safety in case of a heat related problem.

In addition, the power supply is also designed differently by allowing the circulation of cool air, providing a safety tolerance in case of a heat related problems.

Use only shielded LAN cables where the shield is grounded at both ends when connecting to the IO LAN port of the IP+48 on the MGC+ rear panel.

CONT

NET-8

NET-8

NET-8

NET-E1

MUX

MUX

DATA

DATA

VIDEO

VIDEO

VIDEO

VIDEO

AUDIO

AUDIO

AUDIO

AUDIO

Critical

Stby

Stby

Stby

Stby

Stby

Stby

Stby

Stby

Stby

Stby

Stby

Stby

Stby

Stby

Stby

Stby

Major

Fail

Fail

Fail

Fail

Fail

Fail

Fail

Fail

Fail

Fail

Fail

Fail

Fail

Fail

Fail

Fail

Minor

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

Active

L0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Line 1

Line 1

Line 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Line 2

Line 2

Line 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Line 3

Line 3

Line 3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Line 4

Line 4

Line 4

 

 

 

 

 

 

 

 

 

 

 

 

 

Power

Line 5

Line 5

Line 5

Line A

 

 

 

 

 

 

 

 

 

 

 

 

L1

Line 6

Line 6

Line 6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L2

Line 7

Line 7

Line 7

Line B

 

 

 

 

 

 

 

 

 

 

 

 

L3

Line 8

Line 8

Line 8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 2-4: NEBS Standard Unit Front View

2-8

Page 30
Image 30
Polycom MGC-50/MGC-100 installation manual Nebs Standard Unit Front View