Upgrade Kit 208/120V, 380/220V, 400/230V, 415/240V User’s Guide
Powerware Energy Management System EMS
Requesting a Declaration of Conformity
Three−phase alternating current PROTECTIVE CONDUCTOR TERMINAL
Special Symbols
Page
Installation
Table of Contents
Initial System Configuration
Setup Options
Maintenance
Serial Port Service
Specifications
Troubleshooting
Introduction
Chapter
The following options for the EMS−UGK are available
Safety Warnings
IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS
D A N G E R
C A U T I O N
Consignes de sécurité
CONSIGNES DE SÉCURITÉ IMPORTANTES CONSERVER CES INSTRUCTIONS
A T T E N T I O N
D A N G E R
Sicherheitswarnungen
WICHTIGE SICHERHEITSANWEISUNGEN AUFBEWAREN
W A R N U N G
A C H T U N G
Advertencias de Seguridad
INSTRUCCIONES DE SEGURIDAD IMPORTANTES GUARDE ESTAS INSTRUCCIONES
P E L I G R O
P R E C A U C I Ó N
Inspecting the Equipment
Installation
Unpacking the Cabinet
Chapter
Verify that the following items are included with the EMS−UGK
Checking the Parts List
S Pliers or other appropriate tool for installing wire taps
Tools Required
To assemble the components, the following tools may be needed
S Phillips #2 screwdriver
Installing the Hardware
Verify that at least two wall anchors attach to studs within the wall
Figure 4 shows the location of the two serial ports
W A R N I N G
Electrical Connections
C A U T I O N
C A U T I O N
S If installing conduit not supplied, plan for adequate conduit
Table 4. Harness Sizing
Figure 5. Wiring Overview Example Installation
A, B, C
Panel Connections and
Table 5. EMS−UGK Harness Connections
Figure 6. Harness Connections at the Electronics Module
Main Input Harness CTM
Figure 7. Panel Detail EMS−UGK−LV Model with Dual Panel Option Shown
INSTALLATION
If installing dual panels, repeat Step 5 for the second panel
Coil and secure any excess cable away from other conductors
Install each CT around the appropriate subfeed breaker wire
C A U T I O N
12. Choose an option for connecting the phases for voltage sensing
C A U T I O N
Proceed to Step 15 on page
Verify the wire taps are completely closed around the wires
24. Continue to the following section
Installing the Software Configuration Tool
Initial Configuration
Initial System Configuration
Window
Figure 15. System Status Page Connected
voltage. For example, for two 225A panels and a 120V nominal
7. Configure the following required settings
Calc to have the software automatically calculate the VA rating
9. Click Save Sys Config to save the settings to the EMS−UGK. Depending on communication speed, updates take effect within 15-20 seconds
13. Configure the following Building Alarm Settings
12. Configure the following Miscellaneous Features
sounds for each new alarm and can be turned off by
Configuration Using the Software Configuration Tool
6. Repeat Steps 3 through 5 to configure the remaining panels
4. Configure the following settings for the selected panel
main panel breaker alarms and zeroes the panel percent
10. Configure the following settings for the selected breaker
Initial Panel and Breaker Configuration Using the Display
INSTALLATION
12. Continue to the following section, Installation
Advanced Metering Installation
Operation
Reset Function
Breaker Numbering
Chapter
The following table shows the indicator status and description
Control Panel Functions
Display Functions
000.0 000.0 000.0
EATON EMS−UGK
PROFILE SETUP SET UP
The following tables show the basic menu structure
Menu Map
Table 8. Breaker Meters
Table 7. Panel Meters
Use the arrow keys to enter the password for the level you
Setup Options
want to access, then select DONE to display the options for
Use the arrow keys to enter the new password A-Z
Accessing Configuration
Control Panel Configuration
Configuring Panels Containing Branch Circuit Breakers
Panel breaker rating in amps
Configuring Panels Containing Subfeed Breakers
Subfeed breaker rating in amps
NOTE Configure a breaker only if its CT is installed
Configuring Branch Circuit Breakers
7. When all branch circuit configuration is complete, select the
Viewing Breaker Meters
Viewing Panel Meters
Chapter 4 Communication
Serial Port Service
Installing Communication Features
Communication Options
X−Slot Card
Control Terminals
Programmable Signal Inputs Building Alarms
Relay Output Contacts Alarm Relay
W A R N I N G
COMMUNICATION
Replacing the Power Xpert Gateway Series 1000 Card
Maintenance
Recycling the Used Equipment
Updating the Firmware
D A N G E R
Rewiring and Reconfiguring the Installation
W A R N I N G
C A U T I O N
Table 12. Dimensions and Weight
Specifications
Chapter
Table 13. Communication Options
Table 14. Electrical Input
Table 15. Environmental and Safety
Table 16. Display Optional
Main current 6A
Table 17. Metering
SPECIFICATIONS
Typical Alarms and Conditions
Chapter 7 Troubleshooting
Service and Support
All other countries Call your local service representative
TROUBLESHOOTING
Limited Factory Warranty
Warranty
Powerware Energy Management System EMS Upgrade Kit
Chapter
WARRANTY
Page
1642017241