Chapter 2

Installation

This section explains:

SEquipment inspection

SUnpacking

SParts list

SRequired tools

SInstallation and wiring

SInitial configuration

SAdvanced Metering installation

Inspecting the Equipment

If any equipment has been damaged during shipment, keep the shipping cartons and packing materials for the carrier or place of purchase and file a claim for shipping damage. If you discover damage after acceptance, file a claim for concealed damage.

To file a claim for shipping damage or concealed damage: 1) File with the carrier within 15 days of receipt of the equipment; 2) Send a copy of the damage claim within 15 days to your service representative.

Unpacking the Cabinet

Use care when moving and opening the carton. Leave the components packaged until ready to install.

To unpack the cabinet:

1.Open the outer carton and remove the items packaged with the cabinet.

2.Carefully lift the cabinet out of the outer carton.

3.Discard or recycle the packaging in a responsible manner, or store it for future use.

Place the cabinet in a protected area that has adequate airflow and is free of humidity, flammable gas, and corrosion.

EATON Powerware® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com

7

Page 13
Image 13
Powerware 380/220V, 400/230V, 415/240V, 208/120V manual Installation, Inspecting the Equipment, Unpacking the Cabinet, Chapter