Powerware 380/220V, 400/230V manual Harness Sizing, Wiring Overview Example Installation, A, B, C

Models: 415/240V 380/220V 208/120V 400/230V

1 72
Download 72 pages 60.53 Kb
Page 21
Image 21
Table 4. Harness Sizing

INSTALLATION

Table 4. Harness Sizing

Harness

Bundled Length

Connection

Lead Length

 

 

 

 

Voltage

3.05m (10 ft)

Phases (A, B, C)

0.91m (3 ft)

 

 

 

 

 

 

Ground (V1 only), Neutral

1.83m (6 ft)

 

 

 

 

Main Input

2.74m (9 ft)

Phases (A, B, C), Neutral, Ground

304.8 mm (12")

 

 

 

 

Branch Circuit

2.74m (9 ft)

Circuit Breakers 1/1 – 14/28*

304.8 mm (12")

 

 

 

 

 

 

Circuit Breakers 15/8 – 28/35*

203.2 mm (8")

 

 

 

 

 

 

Circuit Breakers 29/15 – 42/42*

101.6 mm (4")

 

 

 

 

Wire Tap Transition

N/A

Three−Phase Circuit Breaker

101.6 mm (4")

 

 

 

 

Subfeed Transition

N/A

Subfeed Breaker

50.8 mm (2")

 

 

 

 

* Circuit breaker numbering: NEMA/Standard (See .)

NOTE Voltage harness

shown installed with wire

Main CTs

(A, B, C)

taps on an occupied

 

branch circuit breaker

 

(20A maximum).

 

Branch CTs

Wire Taps

Neutral

Input Ground CT

Branch Circuit Harnesses

Voltage Harness (A, B, C)

Main Harness Panel Connections and

Electronics Module

Figure 5. Wiring Overview (Example Installation)Manual background CT1

Manual backgroundManual background CT2

Manual backgroundManual background CTM Manual backgroundManual background V2

External Ground (optional)

Panel Connections:

Branch CTs (CT1)

Branch CTs (CT2)

Main CTs (CTM)

Voltage (V1)

Panel Connections and

Communication Features (see Figure 20 on page 49)

Figure 5. Wiring Overview (Example Installation)

EATON Powerware® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com

15

Page 21
Image 21
Powerware 380/220V, 400/230V, 415/240V Harness Sizing, Wiring Overview Example Installation, A, B, C, Panel Connections and