OPERATION
4.On the PANEL CONFIG screen, set the panel’s meter settings:
Default | Range | Meter Setting | Description |
|
|
|
|
3 | 3 | PHASES | Number of phases |
|
|
|
|
42 | BREAKERS* | Number of subfeed breakers in | |
| (even numbers) |
| the panel, times 3 |
|
|
|
|
100 | RATING | Subfeed breaker rating (in amps) | |
|
|
| (see Note 1) |
|
|
|
|
STANDARD | STANDARD | PNL LAYOUT | Panel layout |
| COLUMN |
| (see Note 2) |
|
|
|
|
* For example, if the panel has 6 subfeed breakers, set the BREAKERS value to 18.
NOTE 1 Setting the panel breaker rating to 0 silences all main panel breaker alarms and zeroes the panel percent current levels.
NOTE 2 Changing panel layout erases all branch circuit breaker configurations.
To reset all values on the screen to defaults, set the RESET value to YES.
5.Select OK, the panel number (PNL), then SCHEDULE.
On the PANEL SCHEDULE screen, each subfeed breaker displays as a group of three phases.
6.Select the button to return to the PANEL screen.
7.Repeat Steps 3 to 6 for each panel containing subfeed breakers to configure.
8.When all panel configuration is complete, select the button repeatedly to reach the main menu.
9.If all configuration is complete, save your changes by pressing the Reset button on the Power Xpert Gateway Card in the X−Slot communication bay. (The card automatically resets after five minutes.) Otherwise, continue to the following section,
EATON Powerware® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com | 45 |