INSTALLATION
Main input monitoring option only (one set for each panel if ordered)
(1)Main input harness, with one 28−position circular connector and five 2−position connector plugs (A, B, C, Ground, Neutral)
(4) Main CTs, split−core, 400A, 1V output, with 2−position connector receptacle
(1) Input ground CT, split−core, 100A, 1V output, with 2−position connector receptacle
Conduit box option only (if ordered)
Conduit box, left side
Conduit box, right side, with installed DB−9 extender cable
Subfeed Accessory Kit only (if ordered)
(3) Subfeed transition harnesses, each with 2 two−position connector plugs
(3) Branch CTs, split−core, 400A, 1V output, with two−position connector receptacle
100A Split−Core CTs Accessory Kit only (if ordered)
(10) Branch CTs, split−core, 100A, 1V output, with two−position connector receptacle
75A Split−Core CTs Accessory Kit only (if ordered)
(5) Branch CTs, split−core, 75A, 1V output, with two−position connector receptacle
NOTE Accessory kits may be shipped in separate cartons.
Tools Required
To assemble the components, the following tools may be needed:
SPhillips® #2 screwdriver
SPliers or other appropriate tool for installing wire taps
SDrill or other appropriate tool for installing customer−supplied wall anchors
EATON Powerware® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com | 9 |