Powerware 415/240V, 400/230V, 380/220V, 208/120V manual shows the location of the two serial ports

Models: 415/240V 380/220V 208/120V 400/230V

1 72
Download 72 pages 60.53 Kb
Page 18
Image 18
Figure 4 shows the location of the two serial ports.

INSTALLATION

8.If installing a right conduit box, connect the DB−9 extender cable (installed on the extended serial port on the inside of the right conduit box) to the serial port (Service) on the electronics module.

Figure 4 shows the location of the two serial ports.

9.Slide the conduit box into place on one side of the electronics module. Loosen the mounting bracket screws further if needed.

If installing conduit on both panels, repeat for the other conduit box. Tighten the mounting bracket screws to secure the conduit box(es).

Front Plate

Serial Port (Service)

Extended Serial Port

Left Conduit

Box

Mounting Slots

(4 places)

Ground Bonding Screw

Mounting Bracket Screws (8 places)

Front

2" Bushing

Plate

 

Manual background Card Cover Plate

Manual background 1.5" Bushing

Manual backgroundManual background 1" Bushing

Right Conduit Box

Figure 4. Conduit Box Option

10.Optional but recommended. Attach the conduit box(es) to the wall with appropriate wall anchors (not supplied). Use one or more of the four available mounting slots in each conduit box.

11.Verify that all hardware is mounted and aligned properly, then tighten all screws. Verify the hardware is attached safely and securely to the wall.

12.Continue to the following section,

12 EATON Powerware® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com

Page 18
Image 18
Powerware 415/240V, 400/230V, 380/220V, 208/120V manual shows the location of the two serial ports