INSTALLATION
8.If installing a right conduit box, connect the DB−9 extender cable (installed on the extended serial port on the inside of the right conduit box) to the serial port (Service) on the electronics module.
Figure 4 shows the location of the two serial ports.
9.Slide the conduit box into place on one side of the electronics module. Loosen the mounting bracket screws further if needed.
If installing conduit on both panels, repeat for the other conduit box. Tighten the mounting bracket screws to secure the conduit box(es).
Front Plate
Serial Port (Service)
Extended Serial Port
Left Conduit
Box
Mounting Slots
(4 places)
Ground Bonding Screw
Mounting Bracket Screws (8 places)
Front | 2" Bushing |
Plate |
|
Card Cover Plate
1.5" Bushing
1" Bushing
Right Conduit Box
Figure 4. Conduit Box Option
10.Optional but recommended. Attach the conduit box(es) to the wall with appropriate wall anchors (not supplied). Use one or more of the four available mounting slots in each conduit box.
11.Verify that all hardware is mounted and aligned properly, then tighten all screws. Verify the hardware is attached safely and securely to the wall.
12.Continue to the following section,
12 EATON Powerware® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com