Powerware 208/120V C A U T I O N, Choose an option for connecting the phases for voltage sensing

Models: 415/240V 380/220V 208/120V 400/230V

1 72
Download 72 pages 60.53 Kb
Page 27
Image 27
12.Choose an option for connecting the phases for voltage sensing:

INSTALLATION

C A U T I O N

SPanel 1 voltage sensing includes a ground wire, but Panel 2 voltage sensing does not. If installing dual panels, connect the voltage harness V1 for Panel 1 first. When disconnecting dual panels, disconnect the voltage harness V2 for Panel 2 first.

SUse the branch circuit breakers to disconnect hazardous voltage from the EMS−UGK. Turn off the breaker before disconnecting the voltage measuring circuit cables, or hazardous voltage may be present at the exposed end of the cable.

10.On the voltage harness V1 for Panel 1, locate the green and yellow Ground wire. Attach the Ground ferrule to a ground point within the panel. See Figure 5 on page 15.

11.Attach the Neutral wire to the Neutral bar in the panel. See Figure 5 on page 15.

C A U T I O N

Before connecting the voltage harness to a branch circuit breaker, shut down the branch circuit breaker. Risk of electric shock.

12.Choose an option for connecting the phases for voltage sensing:

NOTE Maximum branch circuit breaker size where the voltage sensing is located is 20A.

SUse the supplied wire tap transition harnesses to connect the voltage harness to an unoccupied three−phase branch circuit breaker (continue to Step 13).

SUse the supplied wire taps to connect the voltage harness to an occupied three−phase branch circuit breaker (proceed to Step 14 on page 23).

EATON Powerware® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com

21

Page 27
Image 27
Powerware 208/120V, 400/230V, 380/220V manual C A U T I O N, Choose an option for connecting the phases for voltage sensing