Chapter 2 Installation | Series |
|
|
Warning! The line pressure must be less than 50 psig for installation.
Caution!
The sensor alignment pointer must point downstream, in the direction of flow.
Insertion Procedure for Flow Meters with No Insertion Tool (Packing Gland Connection)
1.Calculate the required sensor probe insertion length.
2.Fully retract the stem until the sensor head is touching the bottom of the stem housing. Remove the two top stem clamp nuts and loosen two stem clamp bolts. Slide the stem clamp away to expose the packing gland nuts. Loosen the two packing gland nuts.
3.Align the sensor head using the sensor alignment pointer. Adjust the alignment pointer parallel to the pipe and pointing downstream.
4.Insert the sensor head into the pipe until insertion length, I, is achieved. Do not force the stem into the pipe.
5.Tighten the packing gland nuts to stop leakage around the stem. Do not torque over 20
6.Slide the stem clamp back into position. Torque stem clamp bolts to 15