Chapter 2 | Operation |
Initial Rate and Final Thickness are the main process setpoints for this layer of material. Keep in mind that the
Time Setpoint and Thickness Limit are arbitrary values that will activate a relay when they are reached.
Start mode allows you to have this layer start immediately on completion of the previous layer, Auto mode. Manual mode waits for a user signal via the front panel,
Rate Ramps allow the deposition rate to change over time, under PID control. Each rate ramp has a starting thickness, an elapsed time to ramp to the new rate, and a new rate setpoint. Each process layer can have up to two rate ramps.
Press Prev Menu to return to the list of layers, or Exit to Main to return to the Main Screen.