5.3 ICE-CREAM PRODUCTION
After the machine has been installed according to the instructions reported in chapter 3 and carefully cleaned and sanitized according to the instructions reported in chapter 6, proceed as follows to start up the
-Check that the master switch is closed, the STOP pushbutton is lighted up and the water supply cock is open.
-Lift the hopper cover and pour the mixture into the cylinder. Observe the suggested minimum and maximum quantities per cycle according to the following table:
MODEL
C116
C117
C118
MINIMUM
4.2quart (4 liter)
2.1quart (2 liter)
1.05 quart (1 liter)
MAXIMUM
15.8quart (15 liter)
10.5quart (10 liter)
6.3quart (6 liter)
The
5.3.1 AUTOMATIC CYCLE
-Place the cover back on the hopper to prevent dust and other impurities from getting in contact with the mixture.
-Press the AUTOMATIC PRODUCTION pushbutton to start batch freezing.
-The consistency value is visualised on the display during the whole batch freezing cycle.
-After a few minutes and after the ideal consistency level in relation to the type and quantity of mixture used has been reached, the compressor stops, the PRODUCTION pushbutton blinks an intermittent beep is released to warn the operator that the