No.

Part name

Q’ty

Specifications/Vendor

Remarks

 

 

 

 

 

13

Power cord

1

2-cores x 0.75mm² or more, H05RN-F

Procured locally

 

 

 

 

 

14

Thermostat

1

Material: SGCC-Z08, Board thickness: 0.8t

Procured locally

 

fixing plate

 

 

(Drawing attached)

 

 

 

 

 

15

PVC tube

1

Inside diameter Ø8 x outside diameter Ø11 x 70 mm

Procured locally

 

 

 

 

 

16

Shield tube

1

Inside diameter Ø18 x outside diameter Ø26 x 70 mm

Procured locally

 

 

 

Material: Polyethylene foam

 

 

 

 

 

 

17

Bundling tie

1

Bundling tie for securing the wires

Procured locally

 

 

 

Material: 6/6 nylon

 

 

 

 

 

 

NOTE: The parts on the above table are recommended parts.

2. Required tools for installation work

No.

Part name

Specifications

Usage

 

 

 

 

1

Plus screwdriver

 

It is used for disassembling and assembling of each cabinet.

 

 

 

 

2

Wrench

 

It is used for disassembling and assembling of compressor fixing nuts.

 

 

 

 

3

Motor drill

Drill diameter:

It is used to make the additional holes on the base or the side

 

 

Ø3.2 and Ø5.0

cabinet (R).

 

 

 

 

4

Faston crimping tool

Fixing jig for #250

 

 

 

 

 

5

Close-end connector

 

 

 

crimping tool

 

 

 

 

 

 

6

Cutting plier

 

 

 

 

 

 

7

Stripper

 

 

 

 

 

 

8

Cutter knife

 

 

 

 

 

 

9

Insulation tape

 

 

 

 

 

 

10

Metal-cutting shears

 

It is used to process the side cabinet (L).

 

 

 

 

– 185 –