Toshiba RAV-SM562UT-E, RAV-SM1102UT-E Requirement, 151, No. Part name, Procedure, Remarks

Models: RAV-SM562UT-E RAV-SM802UT-E RAV-SM1402UT-E RAV-SM1102UT-E

1 196
Download 196 pages 53.59 Kb
Page 151
Image 151
– 151 –

RAV-SP1102AT-E, RAV-SP1402AT-E

No. Part name

Procedure

Remarks

Common

procedure

REQUIREMENT

Front panel

Before works, put on gloves, otherwise an injury may be caused by parts, etc.

1. Detachment

1)Stop operation of the air conditioner, and turn off switch of the breaker.

2)Remove the front panel. (ST1T Ø4 × 10, 3 pcs.)

• After removing the screws, remove the front panel while drawing it downward.

3)Remove the power cable and the indoor/ outdoor connecting cable from cord clamp and terminal.

4)Remove the roof plate. (ST1T Ø4 × 10, 6 pcs.)

2. Attachment

1)Mount the roof plate. (ST1T Ø4 × 10, 6 pcs.)

2)Connect the power cable and the indoor/ outdoor connecting cable to terminal, and then fix them with cord clamp.

Roof plate

REQUIREMENT

Be sure to fix the power cable and the indoor/outdoor connecting cable with bundling band on the market along the inter-unit cable so that they do not come to contact with the compressor, the valve and the cable at gas side, and the dis- charge pipe.

3)Attach the front panel. (ST1T Ø4 × 10, 3 pcs.)

– 151 –

Page 151
Image 151
Toshiba RAV-SM562UT-E, RAV-SM1102UT-E, RAV-SM1402UT-E, RAV-SM802UT-E Requirement, 151, No. Part name, Procedure, Remarks