System Configurations

A more conservative approach might be to wait to turn off the chiller until it would result in no higher than 80 percent capacity for the remaining operating chillers. Going back to the example, if the desired (n-1) chiller capacity were 80 percent, it would not be appropriate to shut down a chiller. In this case, the plant controller should not turn off any of the chillers until each of them unloaded to 53 percent; (53% + 53% + 53%) / (3-1) = 80%.

Note: For plants with unequally sized chillers, weight the %RLA value of each chiller by its design capacity and compare the weighted value with that of the chiller to be sequenced off.

The other thing that must be checked before subtracting a chiller is how the system flow can be handled by one less chiller. As an example, suppose that two chillers are running near their minimum flow. Chiller 1 is at 650 gpm [41.0 L/s] and Chiller 2 is at 760 gpm [47.9 L/s], so the system total is 1,410 gpm [88.9 L/s].

Choice 1: Turn off Chiller 1. It is obvious that we should be able to turn Chiller 1 off and satisfy system load as long as the flow rate doesn’t increase too rapidly. However, the current system flow rate is close to Chiller 2’s design flow rate of 1440 gpm [90.8 L/s], and if the system flow increases, we may need to restart Chiller 1.

Choice 2: Turn off Chiller 2. If Chiller 1 has a condenser water temperature lower than design, its capacity has increased. Could we turn off Chiller 2? Chiller 1’s flow is certainly within the allowable limits, but it may or may not be able to supply the required capacity. In this case, the dilemma is to ensure that there is enough chilled water capacity after a chiller is turned off.

Obviously, control is an extremely important aspect of a VPF system.

Other VPF control considerations

Select slow-acting valves to control the airside coils.

Valves that open and close slowly moderate the normal fluctuations of chilled water flow through the loop.

Use multiple air handlers, and stagger their start/stop times.

Unless it is programmed to do otherwise, the building automation system will simultaneously shut down all of the air handlers when the occupied period ends. If two chillers are operating when this happens—and if all of the coil-control valves close at the same time—then chilled water flow through the evaporators will drop to zero almost instantaneously. Such a dramatic change not only causes problems for the chillers, but also may deadhead the pumps.

To help ensure that flow-rate changes remain within acceptable limits, “divide” the air handlers into several groups. Then implement control schedules that shut down each group individually at 10-minute intervals.

66

Chiller System Design and Control

SYS-APM001-EN

Page 72
Image 72
Trane SYS-APM001-EN manual Other VPF control considerations, Select slow-acting valves to control the airside coils

SYS-APM001-EN specifications

The Trane SYS-APM001-EN is an advanced control system designed for HVAC (Heating, Ventilation, and Air Conditioning) applications, specifically tailored to enhance energy efficiency and system performance. This comprehensive solution integrates cutting-edge technologies to optimize climate control in commercial and industrial environments.

One of the main features of the SYS-APM001-EN is its intuitive user interface. The system is equipped with a large, easy-to-read display that provides real-time data on system performance, energy usage, and environmental conditions. This user-friendly interface makes it simple for operators to monitor and adjust settings, ensuring optimal comfort levels and efficient energy consumption.

Another key characteristic of the SYS-APM001-EN is its advanced data analytics capabilities. The system collects and analyzes data from various sensors throughout the building, providing insights into occupancy patterns, equipment performance, and energy consumption trends. This data-driven approach allows facility managers to make informed decisions about system adjustments, predictive maintenance, and energy savings.

The SYS-APM001-EN also boasts robust integration capabilities. It can seamlessly connect with a variety of building management systems (BMS) and other third-party devices. This interoperability enables a cohesive operational ecosystem where HVAC systems can communicate and cooperate with lighting, security, and fire safety systems, enhancing overall building efficiency.

Energy efficiency is a hallmark of the SYS-APM001-EN, as it implements sophisticated algorithms to optimize system operation. These algorithms adjust equipment performance in real-time based on current conditions, thereby reducing energy waste and lowering operational costs. The system is designed to support multiple energy-saving strategies, including demand-controlled ventilation and optimal start/stop scheduling.

Additionally, the SYS-APM001-EN is built with scalability in mind, accommodating facilities of various sizes and configurations. Whether it’s a small office building or a large industrial complex, the system can be tailored to meet specific needs, ensuring that HVAC performance aligns with operational goals.

In conclusion, the Trane SYS-APM001-EN is an innovative HVAC control solution that emphasizes user experience, data-driven decision-making, and energy efficiency. With its advanced features and technologies, it is an essential tool for optimizing building performance and enhancing occupant comfort while reducing environmental impact.