Safety
Verification and Commissioning Test
Purpose
This procedure is designed to verify correct operation of the Xantrex Grid Tie Solar Inverter both on initial operation and periodically through its life as required by the utilities.
Commissioning Test
Follow the startup and monitoring procedures as documented in Chapters 4 and 5.
When operation of the inverter has been verified and the unit is producing power, run the
Verification Test
Periodically run the
Non-Islanding Test
This test requires that the AC circuit for the inverter be switched off. This can be accomplished by switching the breaker on the main panel that feeds the inverter(s). As an alternate, the disconnect for the home or business may be used as well. Have someone watch the front panel of the inverter. Within 2 seconds of switching the breaker, the green light on the front of the inverter must go out. The display will respond with an AC Fault display, indicating that the AC is out of the operating range.
Note: The default voltage, frequency and reconnect delay values as defined by UL1741 and CSA
ix |