Index

do not illuminate 6–8red LED is on 6–8

temperatureT

affecting PV array performance 6–2

range for locating Xantrex GT Inverter 2–4terminal blocks in wiring box 3–3terminators, male network 3–13

thermal derating chart A–3torque values for wires 3–5troubleshooting the GT Inverter 6–8

Vvoltmeter

measuring PV array DC at startup 4–2measuring utility AC at startup 4–2

warrantyW

out of warranty service WA–3terms and conditions WA–1

weight A–5

wire stripping length, recommended 2–13wiring

AC connection planning 2–12acceptable wire sizes A–5conduit planning 2–12

DC connection planning 2–12information 2–13knockouts for 2–12

main utility service panel to Xantrex GT Inverter 3–8preparation for 2–13

PV array to Xantrex GT Inverter 3–5routing wires 2–11

torquing 3–5, 3–10 wire sizes 2–13

wiring box description 1–6removing the cover 3–2removing the inverter from 6–6RJ45 connectors 3–3terminal block location 3–3

XanbusXtechnology 3–12

Xantrex web site v

975-0131-01-01

IX–3

Page 107
Image 107
Xantrex Technology GT3.0 owner manual Torquing 3-5, 3-10 wire sizes