Operations 53

Load Ribbon

9. Bring the ribbon leader over the upper ribbon roller (1) and then toward the ribbon take-up spindle (2).

1 2

10.Wind the ribbon leader and attached ribbon counterclockwise around the ribbon take-up spindle.

11.Rotate the spindle counterclockwise several turns to wind the ribbon and remove any slack.

9/6/07

XiIIIPlus/R110Xi/R170Xi User Guide

13383L-004 Rev. A