OPTIONAL ACCESSORIES
... sold separately
Sequential Trip Mechanism Kit (Code No. 881973) (Single Shot Parts)
Pneumatic Tool Lubricant
.8 oz. (25 cc) oil feeder | (Code No.877153) |
4 oz. (120 cc) oil feeder | (Code No.874042) |
1 quart (1 ltr) can | (Code No.876212) |
Case (Code No. 878898) |
|
NOTE: Accessories are subject to change without any obligation on the part of HITACHI.
APPLICATIONS
Floor and wall framing.
Truss
Subflooring and roof decking.
Wall sheathing.
Mobile home and modular housing construction.
BEFORE OPERATION
Read section titled “SAFETY” (pages 4 – 6).
Make sure of the followings before operation.
WORKING ENVIRONMENT
WARNING
No flammable gas, liquid or other flammable objects at worksite.
Clear the area of children or unauthorized personnel.
AIR SUPPLY
DANGER
Never use oxygen, combustible gases or any other bottled gases.
WARNING
Never connect Nailer to pressure which potentially
exceeds 200 psi (13.7 bar 14 kgf/cm2).
Never use non relieving coupler on Nailer.
1.Power source
Use only clean, dry, regulated compressed air as a power source for this Nailer.
English
Air compressors used to supply compressed air to this Nailer must comply with the requirements of the latest version of ANSI Standard B 19.3 “Safety Standard For Compressors For Process Industries.”
Moisture or oil in the air compressor may accelerate wear and corrosion in the Nailer.
Drain daily.
2. Filter-Regulator-Lubricator
Use a regulator with a pressure range of 0 – 120 psi
(0 – 8.3 bar 0 – 8.5 kgf/cm2).
Filter .............. The filter removes moisture and dirt mixed in compressed air.
Drain daily unless fitted with an automatic drain.
Keep the filter clean by regular maintenance.
Regulator ...... The regulator controls the operating pressure for safe operation of the Nailer. Inspect the regulator before operation to be sure it operates properly.
Lubricator ..... The lubricator supplies an oil mist to the Nailer.
Inspect the lubricator before operation to be sure the supply of lubricant is adequate. Use Hitachi pneumatic tool lubricant.
Regulator
Nailer Side Compressor Side
Filter
Lubricator
3. Air hose
Air hose must have a minimum working pressure rating of 150 psi (10.4 bar 10.6 kgf/cm2) or 150% of the maximum pressure produced in the system, whichever is higher.
4. Hose coupling
The Nailer can be installed as follows: Remove the dust seal placed at the air inlet. Install a 3/8 NPT male plug at the air inlet.
Dust Cap
3/8 NPT Male Plug
A female coupler must be on the air hose.
The hose coupling (male
— 9 —