Lochinvar 51-211 Sidewall direct venting, Vent/air termination sidewall, Determine location

Page 22

Installation & Operation Manual

4 Sidewall direct venting

Vent/air termination – sidewall

Figure 4-1APVC/CPVC/Polypropylene Sidewall

￿WARNING

￿WARNING

Follow instructions below when determining vent location to avoid possibility of severe personal injury, death, or substantial property damage.

A gas vent extending through an exterior wall shall not terminate adjacent to a wall or below building extensions such as eaves, parapets, balconies, or decks. Failure to comply could result in severe personal injury, death, or substantial property damage.

Termination of Air and Vent

TO BOILER

INTAKE AIR

CONNECTION

FROM BOILER

VENT PIPE

CONNECTION

12"

POSSIBLE ORIENTATIONS

MIN

TO

OVER-

HANG

VENT / AIR

TERMINATION

Determine location

Locate the vent/air terminations using the following guidelines:

1.The total length of piping for vent or air must not exceed the limits given in the General Venting Section on page 16 of this manual.

2.You must consider the surroundings when terminating the vent and air:

a.Position the vent termination where vapors will not damage nearby shrubs, plants or air conditioning equipment or be objectionable.

b.The flue products will form a noticeable plume as they condense in cold air. Avoid areas where the plume could obstruct window views.

c.Prevailing winds could cause freezing of condensate and water/ice buildup where flue products impinge on building surfaces or plants.

d.Avoid possibility of accidental contact of flue products with people or pets.

e.Do not locate the terminations where wind eddies could affect performance or cause recirculation, such as inside building corners, near adjacent buildings or surfaces, window wells, stairwells, alcoves, courtyards, or other recessed areas.

￿WARNING Sidewall vent and air inlet terminations must terminate in the same pressure zone.

f.Do not terminate above any door or window. Condensate can freeze, causing ice formations.

g.Locate or guard vent to prevent condensate damage to exterior finishes.

22

12"

MIN

 

 

GRADE OR

 

 

SNOW LINE

Table 4A Sidewall Vent Kit

 

Model

Kit Number

Vent Size

51 - 106

KIT30044

2 inch vent

151 - 211

KIT30045

3 inch vent

If using the alternate sidewall termination:

3.The air piping must terminate in a down-turned elbow as shown in FIG. 4-1B. This arrangement avoids recirculation of flue products into the combustion air stream.

4.The vent piping must terminate in an elbow pointed outward or away from the air inlet, as shown in FIG. 4-1B.

￿WARNING Do not exceed the maximum lengths of the outside vent piping shown in FIG. 4-1B.

Excessive length exposed to the outside could cause freezing of condensate in the vent pipe, resulting in potential boiler shutdown.

Figure 4-1BAlternate PVC/CPVC/ Polypropylene Sidewall Termination of Air and Vent w/Field Supplied Fittings

TO BOILER

INTAKE AIR BIRD SCREEN

CONNECTION

FROM BOILER

12” MIN

VENT PIPE

15” MAX

CONNECTION

 

TERMINATION

PLATE

12”

MIN BIRD SCREEN

GRADE OR

SNOW LINE

Image 22
Contents Models 51 Contents When servicing boiler Please read before proceedingKnight Wall Mount Boiler How it works Stainless steel heat exchanger Gas connection pipeModels 51 Ratings Knight Wall Mount Boiler Ahri RatingDetermine boiler location Installation must comply withCloset and alcove installations Before locating the boiler, check1Closet Installation Minimum Required Clearances Wall mounting location PrecautionsVent and air piping Prevent combustion air contaminationProducts to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet Prepare boilerGas conversions Mounting to a concrete wall Mounting the boilerMounting to a wood studded wall Mounting to a metal studded wallDirect venting options Sidewall Vent General ventingDirect venting options Vertical Vent Install vent and combustion air piping Air intake/vent connectionsSizing Requirements for installation in CanadaLength Materials Air inlet pipe materialsAir contamination Optional room airModel Kit Number Vent fittings Material StandardPrimer Polypropylene Centrotherm InnoFlue SWFlue Stainless steel ventApproved Stainless Steel Vent Manufacturers Make Model Flue Intake Air Adapter TerminationVent/air termination sidewall If using the alternate sidewall terminationSidewall direct venting Determine location2AClearance to Gravity Air Inlets Prepare wall penetrations Prepare wall penetrations Alternate Field Supplied OptionMultiple vent/air terminations 5AMultiple Vent Terminations must also comply with -1ASidewall termination optional concentric vent Sidewall termination installationDescription and usage 8Concentric Vent Dimensional Drawing Sidewall termination optional concentric vent models10Concentric Vent Sidewall Attachment Multiventing sidewall terminationsVertical direct venting Vent/air termination verticalPrepare roof penetrations 2Vertical Terminations with Multiple BoilersVertical termination installation Vertical termination optional concentric ventMultiventing vertical terminations Minimum Combustion AIR TypicalAlternate vertical concentric venting Concentric Venting ArrangementExisting vent as a chase AIR Inlet Flue Exhaust Seal CAP Existing Flue OutletLow water cutoff device Hydronic pipingSystem water piping methods General piping information Chilled water systemNear boiler piping components Near boiler piping connections Circulator sizingPump Size Grundfos ArmstrongVariable speed pump option Smart System / Multi-temperature loop control optionVariable speed pump setup UP26-96 FC/VS IFC VS Stratos 1.25 3 x3Single Boiler Single Temperature Zoned with Circulators Number of Units 5Single Boiler Multiple Temperatures Required Pipe Sizes Model 8Single Boiler Zoned with Valves Model Number of Units 10Single Boiler Non-Zoned Primary/Secondary Piping Connecting gas supply piping Gas connectionsNatural gas Propane GasCheck inlet gas supply Natural Gas Pipe Capacity ChartLength of Pipe in Straight Feet for 1/2 PSI Gas valve replacement Gas PressureLine voltage connections Field wiringInstallation must comply with Low voltage connectionsFlow switch Outdoor temperature sensorLouver proving switch ThermostatSystem supply sensor Alarm contactsWiring of the cascade Boiler management system4Low Voltage Field Wiring Connections Condensate disposal Condensate drainCheck/control water chemistry Freeze protection when usedStart-up Fill and test water systemInspect/fill condensate system Clean/Inspect Trap AssemblyCheck for gas leaks Check thermostat circuits Inspect/check condensate lines and fittingsIf boiler does not start correctly Final checks before starting the boilerStart the boiler Check system and boiler2Operating Instructions Set space heating operation Natural Gas PropaneConfiguration of the cascade Verify DHW modeSet domestic hot water DHW operation How the boiler operates Operating informationGeneral How the control module operatesTemperature control Protection featuresBoiler temperature regulation Outdoor reset operation, if used CascadeSequence of operation Operation DisplayInstaller Access modesUser Knight wall mount boiler control module 1Control PanelCall for Heat Operating information Dial Function Service technician Maintenance Maintenance and annual startupOwner maintenance Maintenance Check control settings Check ignition ground wiringCheck all boiler wiring Check expansion tankCleaning boiler heat exchanger Check flame signalReview with owner Heat Exchanger Cleaning Kits Oiled bearing circulatorsDiagrams PC Interface2Wiring Diagram