Lochinvar 51-211 Hydronic piping, System water piping methods General piping information

Page 35

 

Installation & Operation Manual

6 Hydronic piping

 

System water piping methods

General piping information

The Knight wall mount is designed to function in a closed loop pressurized system not less than 12 psi. A temperature and pressure gauge is included to monitor system pressure and outlet temperature and should be located on the boiler outlet.

It is important to note that the boiler has a minimal amount of pressure drop and must be figured in when sizing the circulators. Each boiler installation must have an air elimination device, which will remove air from the system. Install the boiler so the gas ignition system components are protected from water (dripping, spraying, etc.) during appliance operation for basic service of circulator replacement, valves, and others.

Observe a minimum of a 1/4 inch clearance around all un-insulated hot water pipes when openings around the pipes are not protected by non-combustible materials.

Low water cutoff device

On a boiler installed above radiation level, some states and local codes require a low water cutoff device at the time of installation.

Chilled water system

If the boiler supplies hot water to heating coils in air handler units, flow control valves or other devices must be installed to prevent gravity circulation of heater water in the coils during the cooling cycle. A chilled water medium must be piped in parallel with the heater.

Freeze protection

Freeze protection for new or existing systems must use glycol that is specially formulated for this purpose. This includes inhibitors, which prevent the glycol from attacking the metallic system components. Make certain to check that the system fluid is correct for the glycol concentration and inhibitor level. The system should be tested at least once a year and as recommended by the producer of the glycol solution. Allowance should be made for the expansion of the glycol solution in the system piping.

￿WARNING Use only inhibited propylene glycol solutions, which are specifically formulated

for hydronic systems. Ethylene glycol is toxic and can attack gaskets and seals used in hydronic systems.

Basic steps are listed below along with illustrations on the following pages (FIG.’s 6-3 through 6-10), which will guide you through the installation of the Knight wall mount boiler (reference FIG.’s 6-1A and 6-1B).

1.Connect the system return marked “Inlet”.

2.Connect the system supply marked “Outlet”.

3.Install purge and balance valve or shutoff valve and drain on system return to purge air out of each zone.

4.Install a backflow preventer on the cold feed make-up water line.

5.Install a pressure reducing valve on the cold feed make- up water line, (15 psi nominal). Check temperature and pressure gauge (shipped separately), which should read a minimum pressure of 12 psi.

6.Install a circulator as shown on the piping diagrams in this section. Make sure the circulator is properly sized for the system and friction loss.

7.Install an expansion tank on the system supply. Consult the tank manufacturer’s instruction for specific information relating to tank installation. Size the expansion tank for the required system volume and capacity.

8.Install an air elimination device on the system supply.

9.Install a drain valve at the lowest point of the system. Note: The boiler cannot be drained completely of water without purging the unit with an air pressure of 15 psi.

10.This appliance is supplied with a relief valve sized in accordance with ASME Boiler and Pressure Vessel Code, Section IV (“Heating Boilers”). The safety relief valve is installed at the factory located on the left-hand side of the boiler. Pipe the discharge of the safety relief valve to prevent injury in the event of pressure relief. Pipe the discharge to a drain. Provide piping that is the same size as the safety relief valve outlet. Never block the outlet of the safety relief valve.

See the *piping illustrations included in this section, FIG.’s 6-3 through 6-10 for suggested guidelines in piping the Knight wall mount boiler with either zone valves or circulator pumps.

NOTICE

*Please note that these illustrations are

meant to show system piping concept only,

 

 

the installer is responsible for all equipment

 

and detailing required by local codes.

35

Image 35
Contents Models 51 Contents Please read before proceeding When servicing boilerStainless steel heat exchanger Gas connection pipe Knight Wall Mount Boiler How it worksModels 51 Knight Wall Mount Boiler Ahri Rating RatingsBefore locating the boiler, check Installation must comply withCloset and alcove installations Determine boiler location1Closet Installation Minimum Required Clearances Prevent combustion air contamination PrecautionsVent and air piping Wall mounting locationAreas likely to have contaminants When using an existing vent system to install a new boilerProducts to avoid When removing a boiler from existing common vent system Gas conversions Prepare boilerRemove boiler from wood pallet Mounting to a metal studded wall Mounting the boilerMounting to a wood studded wall Mounting to a concrete wallDirect venting options Vertical Vent General ventingDirect venting options Sidewall Vent Air intake/vent connections Install vent and combustion air pipingLength Requirements for installation in CanadaSizing Air inlet pipe materials MaterialsModel Kit Number Optional room airAir contamination Primer Material StandardVent fittings Centrotherm InnoFlue SW PolypropyleneFlue Intake Air Adapter Termination Stainless steel ventApproved Stainless Steel Vent Manufacturers Make Model FlueDetermine location If using the alternate sidewall terminationSidewall direct venting Vent/air termination sidewall2AClearance to Gravity Air Inlets Prepare wall penetrations Alternate Field Supplied Option Prepare wall penetrations5AMultiple Vent Terminations must also comply with -1A Multiple vent/air terminationsDescription and usage Sidewall termination installationSidewall termination optional concentric vent Sidewall termination optional concentric vent models 8Concentric Vent Dimensional DrawingMultiventing sidewall terminations 10Concentric Vent Sidewall AttachmentVent/air termination vertical Vertical direct venting2Vertical Terminations with Multiple Boilers Prepare roof penetrationsVertical termination optional concentric vent Vertical termination installationMinimum Combustion AIR Typical Multiventing vertical terminationsConcentric Venting Arrangement Alternate vertical concentric ventingAIR Inlet Flue Exhaust Seal CAP Existing Flue Outlet Existing vent as a chaseChilled water system Hydronic pipingSystem water piping methods General piping information Low water cutoff deviceNear boiler piping components Circulator sizing Near boiler piping connectionsArmstrong Pump Size GrundfosUP26-96 FC/VS IFC VS Stratos 1.25 3 x Smart System / Multi-temperature loop control optionVariable speed pump setup Variable speed pump option3Single Boiler Single Temperature Zoned with Circulators Number of Units 5Single Boiler Multiple Temperatures Required Pipe Sizes Model 8Single Boiler Zoned with Valves Model Number of Units 10Single Boiler Non-Zoned Primary/Secondary Piping Gas connections Connecting gas supply pipingPropane Gas Natural gasLength of Pipe in Straight Feet for 1/2 PSI Natural Gas Pipe Capacity ChartCheck inlet gas supply Gas Pressure Gas valve replacementLow voltage connections Field wiringInstallation must comply with Line voltage connectionsThermostat Outdoor temperature sensorLouver proving switch Flow switchBoiler management system Alarm contactsWiring of the cascade System supply sensor4Low Voltage Field Wiring Connections Condensate drain Condensate disposalFill and test water system Freeze protection when usedStart-up Check/control water chemistryInspect/check condensate lines and fittings Clean/Inspect Trap AssemblyCheck for gas leaks Check thermostat circuits Inspect/fill condensate systemCheck system and boiler Final checks before starting the boilerStart the boiler If boiler does not start correctly2Operating Instructions Natural Gas Propane Set space heating operationSet domestic hot water DHW operation Verify DHW modeConfiguration of the cascade How the control module operates Operating informationGeneral How the boiler operatesProtection features Temperature controlBoiler temperature regulation Cascade Outdoor reset operation, if usedOperation Display Sequence of operationUser Access modesInstaller 1Control Panel Knight wall mount boiler control moduleCall for Heat Operating information Dial Function Owner maintenance Maintenance Maintenance and annual startupService technician Maintenance Check expansion tank Check ignition ground wiringCheck all boiler wiring Check control settingsReview with owner Check flame signalCleaning boiler heat exchanger Oiled bearing circulators Heat Exchanger Cleaning KitsPC Interface Diagrams2Wiring Diagram