6 Hydronic piping

Near boiler piping components

1.

Boiler system piping:

 

 

 

Boiler system piping MUST be sized per the pipe

 

requirements listed in Table 6A. Reducing the pipe size

 

can restrict the flow rate through the boiler, causing

 

inadvertent high limit shutdowns and poor system

 

performance. Flow rates are based on 20 feet of piping,

 

4 - 90° elbows, and 2 - fully ported ball valves.

 

2.

Boiler circulating pump:

 

 

 

A Grundfos UPS26-99F pump will be provided by the

 

factory (for standard altitude models) as the boiler

 

circulation pump based on 20 feet of piping, 4 - 90°

 

elbows, and 2 - fully ported ball valves.

 

 

Knight wall mount boilers are capable of controlling a

 

variable speed

boiler circulator.

Variable

speed

 

circulators MUST be sized to meet the specified

 

minimum flow requirements listed in FIG. 6-2 on page 38

 

at full speed.

 

 

 

3. Domestic hot water circulating pump:

 

 

Field supplied. The pump MUST be sized to meet

 

the specified minimum flow requirements listed in

 

FIG. 6-2. Consult the indirect water heater operating

 

guide to determine flow characteristics for the selected

 

product used.

 

 

 

4.

Boiler isolation valves:

 

 

 

Field supplied. Full port ball valves are required. Failure

 

to use full port ball valves could result in a restricted flow

 

rate through the boiler.

 

 

5.

Check valves:

 

 

 

 

Field supplied. Check valves are recommended for

 

installation as shown in FIG.’s 6-3 through 6-10. Failure

 

to install check valves could result in a reverse flow

 

condition during pump(s) off cycle.

 

 

6. Domestic indirect hot water isolation valves:

 

Field supplied.

Full port

ball valves

are

Installation & Operation Manual

11.Boiler purge valve:

Field supplied. The boiler purge valve is used to remove entrapped air from the heat exchanger during start-up.

12.System temperature sensor:

Lochinvar supplies a system temperature sensor. The sensor is to be installed in the heating loop downstream from the boiler hot water piping and heating loop junction. Typically the sensor will be located far enough downstream to sense system diluted water temperature.

13.Indirect water heaters:

The Knight wall mount boiler may be piped to an indirect water heater to heat domestic hot water with the space heat transfer medium. As depicted in the piping diagrams on page 40 thru 47, there are two options when utilizing an indirect water heater.

A.The space heating piping will branch off to flow the space heat transfer medium through a single wall heat exchanger coil inside the indirect water heater.

B.The indirect water heater is connected to the system supply piping. A pump controlled by the Knight (wall mount) boiler’s control will regulate the flow of water through the indirect water heater. The indirect water heater’s temperature will be regulated by the Knight (wall mount) boiler’s control.

The Knight wall mount boiler is pre-configured to control the operation of the DHW pump with Domestic Hot Water Prioritization programming. The DHW programming is designed to control and balance the space heating demand by switching between DHW and space heating.

Lochinvar offers the Squire which is a series of indirect water heaters. The Squire features a stainless steel vessel with a single wall stainless steel heat exchanger.

 

required. Failure to use full port ball valves could

 

result in a restricted flow rate through the boiler.

7.

Anti-scald mixing valve:

 

Field supplied.

An anti-scald mixing valve is

 

recommended when storing domestic hot water above

 

115°F.

 

8.

Unions:

 

 

Field supplied. Recommended for unit serviceability.

9.

Temperature and pressure gauge:

 

Factory supplied. The temperature and pressure gauge is

￿WARNING

The National Standard Plumbing Code, the National Plumbing Code of Canada and the Uniform Plumbing Code limit the pressure of the heat transfer fluid to less than the minimum working pressure of the potable water system up to 30 psi maximum. Also, the heat transfer fluid must be water or other non-toxic fluid having a toxicity of Class 1, as listed in Clinical Toxicology of Commercial Products, 5th Edition.

shipped loose. It is the responsibility of the contractor to

install the temperature and pressure gauge on the boiler

water outlet.

10. Pressure relief valve:

Factory supplied. The pressure relief valve is sized to

ASME specifications.

14.Y-Strainer:

Field supplied. A Y-strainer or equivalent multipurpose strainer is recommended at the inlet of the heat exchanger to remove system particles from older hydronic systems and protect newer systems.

36

Image 36
Contents Models 51 Contents When servicing boiler Please read before proceedingKnight Wall Mount Boiler How it works Stainless steel heat exchanger Gas connection pipeModels 51 Ratings Knight Wall Mount Boiler Ahri RatingInstallation must comply with Closet and alcove installationsDetermine boiler location Before locating the boiler, check1Closet Installation Minimum Required Clearances Precautions Vent and air pipingWall mounting location Prevent combustion air contaminationWhen using an existing vent system to install a new boiler Products to avoidAreas likely to have contaminants When removing a boiler from existing common vent system Prepare boiler Remove boiler from wood palletGas conversions Mounting the boiler Mounting to a wood studded wallMounting to a concrete wall Mounting to a metal studded wallGeneral venting Direct venting options Sidewall VentDirect venting options Vertical Vent Install vent and combustion air piping Air intake/vent connectionsRequirements for installation in Canada SizingLength Materials Air inlet pipe materialsOptional room air Air contaminationModel Kit Number Material Standard Vent fittingsPrimer Polypropylene Centrotherm InnoFlue SWStainless steel vent Approved Stainless Steel Vent Manufacturers Make ModelFlue Flue Intake Air Adapter TerminationIf using the alternate sidewall termination Sidewall direct ventingVent/air termination sidewall Determine location2AClearance to Gravity Air Inlets Prepare wall penetrations Prepare wall penetrations Alternate Field Supplied OptionMultiple vent/air terminations 5AMultiple Vent Terminations must also comply with -1ASidewall termination installation Sidewall termination optional concentric ventDescription and usage 8Concentric Vent Dimensional Drawing Sidewall termination optional concentric vent models10Concentric Vent Sidewall Attachment Multiventing sidewall terminationsVertical direct venting Vent/air termination verticalPrepare roof penetrations 2Vertical Terminations with Multiple BoilersVertical termination installation Vertical termination optional concentric ventMultiventing vertical terminations Minimum Combustion AIR TypicalAlternate vertical concentric venting Concentric Venting ArrangementExisting vent as a chase AIR Inlet Flue Exhaust Seal CAP Existing Flue OutletHydronic piping System water piping methods General piping informationLow water cutoff device Chilled water systemNear boiler piping components Near boiler piping connections Circulator sizingPump Size Grundfos ArmstrongSmart System / Multi-temperature loop control option Variable speed pump setupVariable speed pump option UP26-96 FC/VS IFC VS Stratos 1.25 3 x3Single Boiler Single Temperature Zoned with Circulators Number of Units 5Single Boiler Multiple Temperatures Required Pipe Sizes Model 8Single Boiler Zoned with Valves Model Number of Units 10Single Boiler Non-Zoned Primary/Secondary Piping Connecting gas supply piping Gas connectionsNatural gas Propane GasNatural Gas Pipe Capacity Chart Check inlet gas supplyLength of Pipe in Straight Feet for 1/2 PSI Gas valve replacement Gas PressureField wiring Installation must comply withLine voltage connections Low voltage connectionsOutdoor temperature sensor Louver proving switchFlow switch ThermostatAlarm contacts Wiring of the cascadeSystem supply sensor Boiler management system4Low Voltage Field Wiring Connections Condensate disposal Condensate drainFreeze protection when used Start-upCheck/control water chemistry Fill and test water systemClean/Inspect Trap Assembly Check for gas leaks Check thermostat circuitsInspect/fill condensate system Inspect/check condensate lines and fittingsFinal checks before starting the boiler Start the boilerIf boiler does not start correctly Check system and boiler2Operating Instructions Set space heating operation Natural Gas PropaneVerify DHW mode Configuration of the cascadeSet domestic hot water DHW operation Operating information GeneralHow the boiler operates How the control module operatesTemperature control Protection featuresBoiler temperature regulation Outdoor reset operation, if used CascadeSequence of operation Operation DisplayAccess modes InstallerUser Knight wall mount boiler control module 1Control PanelCall for Heat Operating information Dial Function Maintenance Maintenance and annual startup Service technicianOwner maintenance Maintenance Check ignition ground wiring Check all boiler wiringCheck control settings Check expansion tankCheck flame signal Cleaning boiler heat exchangerReview with owner Heat Exchanger Cleaning Kits Oiled bearing circulatorsDiagrams PC Interface2Wiring Diagram