AHRI Rating

 

 

Input

 

Net

AFUE

Model Number

 

Heating

AHRI

Note: Change

 

MBH

Capacity

Ratings

%

 

(Note 5)

MBH

Water,

 

“N” to “L” for

 

 

 

 

MBH

 

L.P. gas models.

 

 

 

 

(Note 1, 8)

 

 

 

(Note 2, 8

(Note 3, 8)

 

Min

 

Max

 

WBN051

10

 

50

45

39

95.3

 

 

 

 

 

 

 

WBN081

16

 

80

72

63

95.3

 

 

 

 

 

 

 

WBN106

21

 

105

94

82

95.4

 

 

 

 

 

 

 

WBN151

30

 

150

135

119

95.5

 

 

 

 

 

 

 

WBN211

42

 

210

190

165

95.7

 

 

 

 

 

 

 

Other Specifications

Boiler Water

Water

Gas

Vent/Air Size

 

Content

 

Connections

Connections

 

Gallons

 

 

 

 

 

 

 

(Note 4)

 

 

 

 

0.6

1"

1/2"

2"

 

 

 

 

0.6

1"

1/2"

2"

 

 

 

 

0.7

1"

1/2"

2"

 

 

 

 

1.3

1"

1/2"

3"

 

 

 

 

1.7

1"

1/2"

3"

 

 

 

 

NOTICE

Maximum allowed working pressure is located on the rating plate.

Notes:

1.As an Energy Star Partner, Lochinvar has determined that Knight wall mount boilers meet the Energy Star guidelines for energy efficiency.

2.The ratings are based on standard test procedures prescribed by the United States Department of Energy.

3.Net AHRI ratings are based on net installed radiation of sufficient quantity for the requirements of the building and nothing need be added for normal piping and pickup. Ratings are based on a piping and pickup allowance of 1.15.

4.Knight wall mount boilers require special gas venting. Use only the vent materials and methods specified in the Knight Wall Mount Installation and Operation Manual.

5.Standard Knight wall mount boilers are equipped to operate from sea level to 4,500 feet only with no adjustments. The boiler will de-rate by 4% for each 1,000 feet above sea level up to 4,500 feet.

6.High altitude Knight wall mount boilers are equipped to operate from 3,000 to 12,000 feet only with no field adjustments. The boiler will de-rate by 2% for each 1,000 feet above 3,000 feet. High altitude models are manufactured with a different control module for altitude operation, but the operation given in this manual remains the same as the standard boilers. A high altitude label (as shown in FIG. A) is also affixed to the unit.

7.The Knight Wall Mount boiler input rate, on some models, is reduced for vent lengths beyond the minimum. Models WB(N,L)081 and WB(N,L)106 with 2" vent will reduce 1% for every 10 feet of vent. Models WB(N,L)151 and WB(N,L)211 with 3" vent will reduce 0.5% for every 10 feet of vent.

8.Ratings have been confirmed by the Hydronics Section of AHRI.

9.Knight wall mount boilers comply with the requirements of CSD-1 Section CW-400 requirements as a temperature operation control. The manual reset high limit provided with the Knight wall mount is listed to UL353.

UNIT EQUIPPED FOR

HIGH ALTITUDE

3,000 FT. TO 12,000 FT.

6

Figure A High Altitude Label Location

Image 6
Contents Models 51 Contents When servicing boiler Please read before proceedingKnight Wall Mount Boiler How it works Stainless steel heat exchanger Gas connection pipeModels 51 Ratings Knight Wall Mount Boiler Ahri RatingDetermine boiler location Installation must comply withCloset and alcove installations Before locating the boiler, check1Closet Installation Minimum Required Clearances Wall mounting location PrecautionsVent and air piping Prevent combustion air contaminationWhen using an existing vent system to install a new boiler Products to avoidAreas likely to have contaminants When removing a boiler from existing common vent system Prepare boiler Remove boiler from wood palletGas conversions Mounting to a concrete wall Mounting the boilerMounting to a wood studded wall Mounting to a metal studded wallGeneral venting Direct venting options Sidewall VentDirect venting options Vertical Vent Install vent and combustion air piping Air intake/vent connectionsRequirements for installation in Canada SizingLength Materials Air inlet pipe materialsOptional room air Air contaminationModel Kit Number Material Standard Vent fittingsPrimer Polypropylene Centrotherm InnoFlue SWFlue Stainless steel ventApproved Stainless Steel Vent Manufacturers Make Model Flue Intake Air Adapter TerminationVent/air termination sidewall If using the alternate sidewall terminationSidewall direct venting Determine location2AClearance to Gravity Air Inlets Prepare wall penetrations Prepare wall penetrations Alternate Field Supplied OptionMultiple vent/air terminations 5AMultiple Vent Terminations must also comply with -1ASidewall termination installation Sidewall termination optional concentric ventDescription and usage 8Concentric Vent Dimensional Drawing Sidewall termination optional concentric vent models10Concentric Vent Sidewall Attachment Multiventing sidewall terminationsVertical direct venting Vent/air termination verticalPrepare roof penetrations 2Vertical Terminations with Multiple BoilersVertical termination installation Vertical termination optional concentric ventMultiventing vertical terminations Minimum Combustion AIR TypicalAlternate vertical concentric venting Concentric Venting ArrangementExisting vent as a chase AIR Inlet Flue Exhaust Seal CAP Existing Flue OutletLow water cutoff device Hydronic pipingSystem water piping methods General piping information Chilled water systemNear boiler piping components Near boiler piping connections Circulator sizingPump Size Grundfos ArmstrongVariable speed pump option Smart System / Multi-temperature loop control optionVariable speed pump setup UP26-96 FC/VS IFC VS Stratos 1.25 3 x3Single Boiler Single Temperature Zoned with Circulators Number of Units 5Single Boiler Multiple Temperatures Required Pipe Sizes Model 8Single Boiler Zoned with Valves Model Number of Units 10Single Boiler Non-Zoned Primary/Secondary Piping Connecting gas supply piping Gas connectionsNatural gas Propane GasNatural Gas Pipe Capacity Chart Check inlet gas supplyLength of Pipe in Straight Feet for 1/2 PSI Gas valve replacement Gas PressureLine voltage connections Field wiringInstallation must comply with Low voltage connectionsFlow switch Outdoor temperature sensorLouver proving switch ThermostatSystem supply sensor Alarm contactsWiring of the cascade Boiler management system4Low Voltage Field Wiring Connections Condensate disposal Condensate drainCheck/control water chemistry Freeze protection when usedStart-up Fill and test water systemInspect/fill condensate system Clean/Inspect Trap AssemblyCheck for gas leaks Check thermostat circuits Inspect/check condensate lines and fittingsIf boiler does not start correctly Final checks before starting the boilerStart the boiler Check system and boiler2Operating Instructions Set space heating operation Natural Gas PropaneVerify DHW mode Configuration of the cascadeSet domestic hot water DHW operation How the boiler operates Operating informationGeneral How the control module operatesTemperature control Protection featuresBoiler temperature regulation Outdoor reset operation, if used CascadeSequence of operation Operation DisplayAccess modes InstallerUser Knight wall mount boiler control module 1Control PanelCall for Heat Operating information Dial Function Maintenance Maintenance and annual startup Service technicianOwner maintenance Maintenance Check control settings Check ignition ground wiringCheck all boiler wiring Check expansion tankCheck flame signal Cleaning boiler heat exchangerReview with owner Heat Exchanger Cleaning Kits Oiled bearing circulatorsDiagrams PC Interface2Wiring Diagram
Related manuals
Manual 16 pages 37.78 Kb