Lochinvar 51-211 Sidewall termination optional concentric vent, Description and usage

Page 26

Installation & Operation Manual

4 Sidewall direct venting

Sidewall termination – optional concentric vent

Description and usage

Lochinvar offers optional concentric combustion air and vent pipe termination kits (Factory Kit #CVK3003 - 3" or #CVK3008

-2"). Both combustion air and vent pipes must attach to the termination kit. The termination kit must terminate outside the structure and must be installed as shown below in FIG. 4-6.

The required combustion vent pipe and fittings are listed in Table 3D, on page 19 of this manual.

Figure 4-6Concentric Sidewall Termination

Sidewall termination installation

1.Determine the best location for the termination kit (see FIG. 4-6).

2.Reference the Determine Location Section on page 22 of this manual for general termination considerations.

3.Cut one (1) hole (5 inch diameter for #CVK3003 installations or 4 inch diameter for #CVK3008 installations) into the structure to install the termination kit.

4.Partially assemble the concentric vent termination kit. Clean and cement using the procedures found in these instructions.

a.Cement the Y concentric fitting to the larger kit pipe (FIG. 4-7).

b.Cement the rain cap to the smaller diameter kit pipe (FIG. 4-7).

Figure 4-7Kit Contents

26

Image 26
Contents Models 51 Contents When servicing boiler Please read before proceedingKnight Wall Mount Boiler How it works Stainless steel heat exchanger Gas connection pipeModels 51 Ratings Knight Wall Mount Boiler Ahri RatingDetermine boiler location Installation must comply withCloset and alcove installations Before locating the boiler, check1Closet Installation Minimum Required Clearances Wall mounting location PrecautionsVent and air piping Prevent combustion air contaminationAreas likely to have contaminants When using an existing vent system to install a new boilerProducts to avoid When removing a boiler from existing common vent system Gas conversions Prepare boilerRemove boiler from wood pallet Mounting to a concrete wall Mounting the boilerMounting to a wood studded wall Mounting to a metal studded wallDirect venting options Vertical Vent General ventingDirect venting options Sidewall Vent Install vent and combustion air piping Air intake/vent connectionsLength Requirements for installation in CanadaSizing Materials Air inlet pipe materialsModel Kit Number Optional room airAir contamination Primer Material StandardVent fittings Polypropylene Centrotherm InnoFlue SWFlue Stainless steel ventApproved Stainless Steel Vent Manufacturers Make Model Flue Intake Air Adapter TerminationVent/air termination sidewall If using the alternate sidewall terminationSidewall direct venting Determine location2AClearance to Gravity Air Inlets Prepare wall penetrations Prepare wall penetrations Alternate Field Supplied OptionMultiple vent/air terminations 5AMultiple Vent Terminations must also comply with -1ADescription and usage Sidewall termination installationSidewall termination optional concentric vent 8Concentric Vent Dimensional Drawing Sidewall termination optional concentric vent models10Concentric Vent Sidewall Attachment Multiventing sidewall terminationsVertical direct venting Vent/air termination verticalPrepare roof penetrations 2Vertical Terminations with Multiple BoilersVertical termination installation Vertical termination optional concentric ventMultiventing vertical terminations Minimum Combustion AIR TypicalAlternate vertical concentric venting Concentric Venting ArrangementExisting vent as a chase AIR Inlet Flue Exhaust Seal CAP Existing Flue OutletLow water cutoff device Hydronic pipingSystem water piping methods General piping information Chilled water systemNear boiler piping components Near boiler piping connections Circulator sizingPump Size Grundfos ArmstrongVariable speed pump option Smart System / Multi-temperature loop control optionVariable speed pump setup UP26-96 FC/VS IFC VS Stratos 1.25 3 x3Single Boiler Single Temperature Zoned with Circulators Number of Units 5Single Boiler Multiple Temperatures Required Pipe Sizes Model 8Single Boiler Zoned with Valves Model Number of Units 10Single Boiler Non-Zoned Primary/Secondary Piping Connecting gas supply piping Gas connectionsNatural gas Propane GasLength of Pipe in Straight Feet for 1/2 PSI Natural Gas Pipe Capacity ChartCheck inlet gas supply Gas valve replacement Gas PressureLine voltage connections Field wiringInstallation must comply with Low voltage connectionsFlow switch Outdoor temperature sensorLouver proving switch ThermostatSystem supply sensor Alarm contactsWiring of the cascade Boiler management system4Low Voltage Field Wiring Connections Condensate disposal Condensate drainCheck/control water chemistry Freeze protection when usedStart-up Fill and test water systemInspect/fill condensate system Clean/Inspect Trap AssemblyCheck for gas leaks Check thermostat circuits Inspect/check condensate lines and fittingsIf boiler does not start correctly Final checks before starting the boilerStart the boiler Check system and boiler2Operating Instructions Set space heating operation Natural Gas PropaneSet domestic hot water DHW operation Verify DHW modeConfiguration of the cascade How the boiler operates Operating informationGeneral How the control module operatesTemperature control Protection featuresBoiler temperature regulation Outdoor reset operation, if used CascadeSequence of operation Operation DisplayUser Access modesInstaller Knight wall mount boiler control module 1Control PanelCall for Heat Operating information Dial Function Owner maintenance Maintenance Maintenance and annual startupService technician Maintenance Check control settings Check ignition ground wiringCheck all boiler wiring Check expansion tankReview with owner Check flame signalCleaning boiler heat exchanger Heat Exchanger Cleaning Kits Oiled bearing circulatorsDiagrams PC Interface2Wiring Diagram