Lochinvar
51-211
operation manual
2Operating Instructions
Install
Diagrams
Alarm contacts
Connecting gas supply piping
Maintenance
Configuration of the cascade
Access modes
Variable speed pump setup
Clean/Inspect Trap Assembly
Check control settings
Page 60
Installation & Operation Manual
10
Start-up
Figure
10-2
Operating Instructions
60
Page 59
Page 61
Image 60
Page 59
Page 61
Contents
Models 51
Contents
When servicing boiler
Please read before proceeding
Knight Wall Mount Boiler How it works
Stainless steel heat exchanger Gas connection pipe
Models 51
Ratings
Knight Wall Mount Boiler Ahri Rating
Installation must comply with
Closet and alcove installations
Determine boiler location
Before locating the boiler, check
1Closet Installation Minimum Required Clearances
Precautions
Vent and air piping
Wall mounting location
Prevent combustion air contamination
When using an existing vent system to install a new boiler
Products to avoid
Areas likely to have contaminants
When removing a boiler from existing common vent system
Prepare boiler
Remove boiler from wood pallet
Gas conversions
Mounting the boiler
Mounting to a wood studded wall
Mounting to a concrete wall
Mounting to a metal studded wall
General venting
Direct venting options Sidewall Vent
Direct venting options Vertical Vent
Install vent and combustion air piping
Air intake/vent connections
Requirements for installation in Canada
Sizing
Length
Materials
Air inlet pipe materials
Optional room air
Air contamination
Model Kit Number
Material Standard
Vent fittings
Primer
Polypropylene
Centrotherm InnoFlue SW
Stainless steel vent
Approved Stainless Steel Vent Manufacturers Make Model
Flue
Flue Intake Air Adapter Termination
If using the alternate sidewall termination
Sidewall direct venting
Vent/air termination sidewall
Determine location
2AClearance to Gravity Air Inlets
Prepare wall penetrations
Prepare wall penetrations Alternate Field Supplied Option
Multiple vent/air terminations
5AMultiple Vent Terminations must also comply with -1A
Sidewall termination installation
Sidewall termination optional concentric vent
Description and usage
8Concentric Vent Dimensional Drawing
Sidewall termination optional concentric vent models
10Concentric Vent Sidewall Attachment
Multiventing sidewall terminations
Vertical direct venting
Vent/air termination vertical
Prepare roof penetrations
2Vertical Terminations with Multiple Boilers
Vertical termination installation
Vertical termination optional concentric vent
Multiventing vertical terminations
Minimum Combustion AIR Typical
Alternate vertical concentric venting
Concentric Venting Arrangement
Existing vent as a chase
AIR Inlet Flue Exhaust Seal CAP Existing Flue Outlet
Hydronic piping
System water piping methods General piping information
Low water cutoff device
Chilled water system
Near boiler piping components
Near boiler piping connections
Circulator sizing
Pump Size Grundfos
Armstrong
Smart System / Multi-temperature loop control option
Variable speed pump setup
Variable speed pump option
UP26-96 FC/VS IFC VS Stratos 1.25 3 x
3Single Boiler Single Temperature Zoned with Circulators
Number of Units
5Single Boiler Multiple Temperatures
Required Pipe Sizes
Model
8Single Boiler Zoned with Valves
Model Number of Units
10Single Boiler Non-Zoned Primary/Secondary Piping
Connecting gas supply piping
Gas connections
Natural gas
Propane Gas
Natural Gas Pipe Capacity Chart
Check inlet gas supply
Length of Pipe in Straight Feet for 1/2 PSI
Gas valve replacement
Gas Pressure
Field wiring
Installation must comply with
Line voltage connections
Low voltage connections
Outdoor temperature sensor
Louver proving switch
Flow switch
Thermostat
Alarm contacts
Wiring of the cascade
System supply sensor
Boiler management system
4Low Voltage Field Wiring Connections
Condensate disposal
Condensate drain
Freeze protection when used
Start-up
Check/control water chemistry
Fill and test water system
Clean/Inspect Trap Assembly
Check for gas leaks Check thermostat circuits
Inspect/fill condensate system
Inspect/check condensate lines and fittings
Final checks before starting the boiler
Start the boiler
If boiler does not start correctly
Check system and boiler
2Operating Instructions
Set space heating operation
Natural Gas Propane
Verify DHW mode
Configuration of the cascade
Set domestic hot water DHW operation
Operating information
General
How the boiler operates
How the control module operates
Temperature control
Protection features
Boiler temperature regulation
Outdoor reset operation, if used
Cascade
Sequence of operation
Operation Display
Access modes
Installer
User
Knight wall mount boiler control module
1Control Panel
Call for Heat
Operating information
Dial Function
Maintenance Maintenance and annual startup
Service technician
Owner maintenance
Maintenance
Check ignition ground wiring
Check all boiler wiring
Check control settings
Check expansion tank
Check flame signal
Cleaning boiler heat exchanger
Review with owner
Heat Exchanger Cleaning Kits
Oiled bearing circulators
Diagrams
PC Interface
2Wiring Diagram
Related manuals
Manual
16 pages
37.78 Kb
Related pages
Troubleshooting for Miller Electric UWF-SC12RC
Technical Specifications for Zanussi ZI 310 DIS
ERROR MESSAGES for Agilent Technologies 668xA
Power Block Diagram for LG Electronics TL-AT130M
How to Order Client Support Materials for IBM V-CAN
Introduction and Installation for Panasonic DP-MB350
Spare Parts List for Honeywell Central Heating Cooker Natural Gas
Controlling the rest of your system Preset Code List for Pioneer XRB3089-A
Setting Daylight Savings Time for Honeywell 800-08091V3
If the MP3-CD menu is switched off for Philips MCD129/93
How often should I service my
Sears furnace
?
Top
Page
Image
Contents