Lochinvar 51-211 operation manual 2AClearance to Gravity Air Inlets

Page 23

Installation & Operation Manual

4 Sidewall direct venting (continued)

Vent/air termination – sidewall

Figure 4-1CAlternate Venting Arrangement (if Space Allows) w/Field Supplied Fittings

TO BOILER

INTAKE AIRCOUPLING

CONNECTION

12” MIN

15” MAX

FROM BOILER

VENT PIPE

CONNECTION

BIRD SCREEN

12”

MIN

BIRD

SCREEN

GRADE OR

SNOW LINE

ALTERNATE VENTING ARRANGEMENT

(IF SPACE PERMITS)

Figure 4-1DAlternate Venting Arrangement - Typical Stainless Steel Sidewall Termination of Air and Vent w/ Field Supplied Fittings

TO BOILER

 

INTAKE AIR

12" MIN

CONNECTION

15" MAX

FROM

 

BOILER

 

VENT PIPE

 

CONNECTION

 

12" MIN

BIRD SCREEN

GRADE OR SNOW LINE

5. Maintain clearances as shown in FIG.’s 4-1A thru 4-3B,

pages 22 - 23. Also maintain the following:

a.

Vent must terminate:

 

• At least 6 feet from adjacent walls.

 

• No closer than 12 inches below roof overhang.

 

• At least 7 feet above any public walkway.

 

• At least 3 feet above any forced air intake within

 

10 feet.

 

• No closer than 12 inches below or horizontally

 

from any door or window or any other gravity air

 

inlet.

b.

Air inlet must terminate at least 12 inches above

Figure 4-2AClearance to Gravity Air Inlets

12"

MIN.

VENT / AIR

TERMINATION 12"

MIN.

12"

MIN.

Figure 4-2BAlternate Clearance to Gravity Air Inlets w/ Field Supplied Fittings

12”

MIN

BIRD

SCREEN

(TYPICAL)

12”

MIN

12”

MIN

Figure 4-3AClearance to Forced Air Inlets

IF LESS

THAN 10’

VENT / AIR

36"

TERMINATION

MIN.

 

FORCED AIR

INLET

7' MIN. ABOVE ANY PUBLIC WALKWAY

Figure 4-3BAlternate Clearance to Forced Air Inlets w/ Field Supplied Fittings

grade or snow line; at least 12 inches below the vent

termination; and the vent pipe must not extend

more than 24 inches vertically outside the building

as shown in FIG. 4-1B. Condensate could freeze and

block vent pipe.

c. Do not terminate closer than 4 feet horizontally

from any electric meter, gas meter, regulator, relief

valve, or other equipment. Never terminate above or

below any of these within 4 feet horizontally.

6. Locate terminations so they are not likely to be damaged by

foreign objects, such as stones or balls, or subject to buildup

of leaves or sediment.

7’ MIN ABOVE ANY PUBLIC WALKWAY

IF LESS

THAN 10’

36”

MIN

FORCED AIR

INLET

BIRD

SCREEN

(TYPICAL)

23

Image 23
Contents Models 51 Contents Please read before proceeding When servicing boilerStainless steel heat exchanger Gas connection pipe Knight Wall Mount Boiler How it worksModels 51 Knight Wall Mount Boiler Ahri Rating RatingsBefore locating the boiler, check Installation must comply withCloset and alcove installations Determine boiler location1Closet Installation Minimum Required Clearances Prevent combustion air contamination PrecautionsVent and air piping Wall mounting locationAreas likely to have contaminants When using an existing vent system to install a new boilerProducts to avoid When removing a boiler from existing common vent system Gas conversions Prepare boilerRemove boiler from wood pallet Mounting to a metal studded wall Mounting the boilerMounting to a wood studded wall Mounting to a concrete wallDirect venting options Vertical Vent General ventingDirect venting options Sidewall Vent Air intake/vent connections Install vent and combustion air pipingLength Requirements for installation in CanadaSizing Air inlet pipe materials MaterialsModel Kit Number Optional room airAir contamination Primer Material StandardVent fittings Centrotherm InnoFlue SW PolypropyleneFlue Intake Air Adapter Termination Stainless steel ventApproved Stainless Steel Vent Manufacturers Make Model FlueDetermine location If using the alternate sidewall terminationSidewall direct venting Vent/air termination sidewall2AClearance to Gravity Air Inlets Prepare wall penetrations Alternate Field Supplied Option Prepare wall penetrations5AMultiple Vent Terminations must also comply with -1A Multiple vent/air terminationsDescription and usage Sidewall termination installationSidewall termination optional concentric vent Sidewall termination optional concentric vent models 8Concentric Vent Dimensional DrawingMultiventing sidewall terminations 10Concentric Vent Sidewall AttachmentVent/air termination vertical Vertical direct venting2Vertical Terminations with Multiple Boilers Prepare roof penetrationsVertical termination optional concentric vent Vertical termination installationMinimum Combustion AIR Typical Multiventing vertical terminationsConcentric Venting Arrangement Alternate vertical concentric ventingAIR Inlet Flue Exhaust Seal CAP Existing Flue Outlet Existing vent as a chaseChilled water system Hydronic pipingSystem water piping methods General piping information Low water cutoff deviceNear boiler piping components Circulator sizing Near boiler piping connectionsArmstrong Pump Size GrundfosUP26-96 FC/VS IFC VS Stratos 1.25 3 x Smart System / Multi-temperature loop control optionVariable speed pump setup Variable speed pump option3Single Boiler Single Temperature Zoned with Circulators Number of Units 5Single Boiler Multiple Temperatures Required Pipe Sizes Model 8Single Boiler Zoned with Valves Model Number of Units 10Single Boiler Non-Zoned Primary/Secondary Piping Gas connections Connecting gas supply pipingPropane Gas Natural gasLength of Pipe in Straight Feet for 1/2 PSI Natural Gas Pipe Capacity ChartCheck inlet gas supply Gas Pressure Gas valve replacementLow voltage connections Field wiringInstallation must comply with Line voltage connectionsThermostat Outdoor temperature sensorLouver proving switch Flow switchBoiler management system Alarm contactsWiring of the cascade System supply sensor4Low Voltage Field Wiring Connections Condensate drain Condensate disposalFill and test water system Freeze protection when usedStart-up Check/control water chemistryInspect/check condensate lines and fittings Clean/Inspect Trap AssemblyCheck for gas leaks Check thermostat circuits Inspect/fill condensate systemCheck system and boiler Final checks before starting the boilerStart the boiler If boiler does not start correctly2Operating Instructions Natural Gas Propane Set space heating operationSet domestic hot water DHW operation Verify DHW modeConfiguration of the cascade How the control module operates Operating informationGeneral How the boiler operatesProtection features Temperature controlBoiler temperature regulation Cascade Outdoor reset operation, if usedOperation Display Sequence of operationUser Access modesInstaller 1Control Panel Knight wall mount boiler control moduleCall for Heat Operating information Dial Function Owner maintenance Maintenance Maintenance and annual startupService technician Maintenance Check expansion tank Check ignition ground wiringCheck all boiler wiring Check control settingsReview with owner Check flame signalCleaning boiler heat exchanger Oiled bearing circulators Heat Exchanger Cleaning KitsPC Interface Diagrams2Wiring Diagram
Related manuals
Manual 16 pages 37.78 Kb