Lochinvar 51-211 operation manual Prepare wall penetrations

Page 24

4 Sidewall direct venting

Prepare wall penetrations

Installation & Operation Manual

Figure 4-4BPolypropylene Sidewall Termination Assembly

1.Use the factory supplied wall plate as a template to locate the vent and air intake holes and mounting holes.

Air pipe penetration:

a.Cut a hole for the air pipe. Size the air pipe hole as close as desired to the air pipe outside diameter.

Vent pipe penetration:

a.Cut a hole for the vent pipe. For either combustible or noncombustible construction, size the vent pipe hole with at least a 1/2 inch clearance around the vent pipe outer diameter:

3½ inch hole for 2 inch vent pipe

4½ inch hole for 3 inch vent pipe

Drill 3/16" diameter holes for inserting the plastic anchors into the wall.

2. For Polypropylene Only: Install the vent and air intake

sidewall adapters from Table 3F on page 20 into the vent

plate. Slide the sidewall retaining bracket down the

SIDEWALL ADAPTER (VENT)

GALVANIZED

THIMBLE

SIDEWALL

ADAPTER

(AIR)

WALL

PLATE

SIDEWALL

RETAINING

PLATE

VENT

PLATE

VENT

CAP

IMG00085

 

sidewall adapters flush to the vent plate (FIG. 4-4B).

3.

For PVC/CPVC Only: Install the vent and air intake

 

piping through the wall into the vent plate openings.

 

Use RTV silicone sealant to seal the air pipe. Use the

 

cement/primer listed in Table 3D on page 19 to seal the

 

vent pipe.

4.

Mount and secure the vent plate to the wall, using stainless

 

steel screws.

5.

Seal all gaps between the pipes and wall. Seal around the

 

plate to the wall assuring no air gaps.

6.

Assemble the vent cap to the vent plate (see FIG.'s 4-4A

 

and 4-4B). Insert the stainless steel screws into the vent

 

cap screw hole openings and securely attach the vent cap

 

to the vent plate.

7.

Seal all wall cavities.

8.

PVC/CPVC terminations are designed to accommodate

 

any wall thickness of standard constructions per the

 

directions found in this manual.

9.

Stainless steel terminations are designed to penetrate

 

walls with a thickness up to 9.25 inches of standard

 

construction.

Figure 4-4APVC/CPVC Sidewall Termination Assembly

VENT AIR

Prepare wall penetrations (Alternate - Field Supplied Option)

1.Air pipe penetration:

a.Cut a hole for the air pipe. Size the air pipe hole as close as desired to the air pipe outside diameter.

2.Vent pipe penetration:

a.Cut a hole for the vent pipe. For either combustible or noncombustible construction, size the vent pipe hole with at least a 1/2 inch clearance around the vent pipe outer diameter:

3½ inch hole for 2 inch vent pipe

4½ inch hole for 3 inch vent pipe

b.Insert a galvanized metal thimble in the vent pipe hole as shown in FIG. 4-4C.

3.Use a sidewall termination plate as a template for correct location of hole centers.

4.Follow all local codes for isolation of vent pipe when passing through floors or walls.

5.Seal exterior openings thoroughly with exterior caulk.

Figure 4-4CAlternate Sidewall Termination Assembly w/Field Supplied Fittings

ELBOW

AIR PIPING

VENT PIPING

BIRD SCREEN

AIR PIPING

VENT PIPING

WALL PLATE

GALVANIZED

THIMBLE

24

CENTERLINE WIDTH

VENT PLATE

VENT CAP

GALVANIZED

 

ELBOW

THIMBLE

 

 

 

 

SIDEWALL

BIRD SCREEN

 

 

 

TERMINATION PLATE

 

Image 24
Contents Models 51 Contents When servicing boiler Please read before proceedingKnight Wall Mount Boiler How it works Stainless steel heat exchanger Gas connection pipeModels 51 Ratings Knight Wall Mount Boiler Ahri RatingInstallation must comply with Closet and alcove installationsDetermine boiler location Before locating the boiler, check1Closet Installation Minimum Required Clearances Precautions Vent and air pipingWall mounting location Prevent combustion air contaminationWhen using an existing vent system to install a new boiler Products to avoidAreas likely to have contaminants When removing a boiler from existing common vent system Prepare boiler Remove boiler from wood palletGas conversions Mounting the boiler Mounting to a wood studded wallMounting to a concrete wall Mounting to a metal studded wallGeneral venting Direct venting options Sidewall VentDirect venting options Vertical Vent Install vent and combustion air piping Air intake/vent connectionsRequirements for installation in Canada SizingLength Materials Air inlet pipe materialsOptional room air Air contaminationModel Kit Number Material Standard Vent fittingsPrimer Polypropylene Centrotherm InnoFlue SWStainless steel vent Approved Stainless Steel Vent Manufacturers Make ModelFlue Flue Intake Air Adapter TerminationIf using the alternate sidewall termination Sidewall direct ventingVent/air termination sidewall Determine location2AClearance to Gravity Air Inlets Prepare wall penetrations Prepare wall penetrations Alternate Field Supplied OptionMultiple vent/air terminations 5AMultiple Vent Terminations must also comply with -1ASidewall termination installation Sidewall termination optional concentric ventDescription and usage 8Concentric Vent Dimensional Drawing Sidewall termination optional concentric vent models10Concentric Vent Sidewall Attachment Multiventing sidewall terminationsVertical direct venting Vent/air termination verticalPrepare roof penetrations 2Vertical Terminations with Multiple BoilersVertical termination installation Vertical termination optional concentric ventMultiventing vertical terminations Minimum Combustion AIR TypicalAlternate vertical concentric venting Concentric Venting ArrangementExisting vent as a chase AIR Inlet Flue Exhaust Seal CAP Existing Flue OutletHydronic piping System water piping methods General piping informationLow water cutoff device Chilled water systemNear boiler piping components Near boiler piping connections Circulator sizingPump Size Grundfos ArmstrongSmart System / Multi-temperature loop control option Variable speed pump setupVariable speed pump option UP26-96 FC/VS IFC VS Stratos 1.25 3 x3Single Boiler Single Temperature Zoned with Circulators Number of Units 5Single Boiler Multiple Temperatures Required Pipe Sizes Model 8Single Boiler Zoned with Valves Model Number of Units 10Single Boiler Non-Zoned Primary/Secondary Piping Connecting gas supply piping Gas connectionsNatural gas Propane GasNatural Gas Pipe Capacity Chart Check inlet gas supplyLength of Pipe in Straight Feet for 1/2 PSI Gas valve replacement Gas PressureField wiring Installation must comply withLine voltage connections Low voltage connectionsOutdoor temperature sensor Louver proving switchFlow switch ThermostatAlarm contacts Wiring of the cascadeSystem supply sensor Boiler management system4Low Voltage Field Wiring Connections Condensate disposal Condensate drainFreeze protection when used Start-upCheck/control water chemistry Fill and test water systemClean/Inspect Trap Assembly Check for gas leaks Check thermostat circuitsInspect/fill condensate system Inspect/check condensate lines and fittingsFinal checks before starting the boiler Start the boilerIf boiler does not start correctly Check system and boiler2Operating Instructions Set space heating operation Natural Gas PropaneVerify DHW mode Configuration of the cascadeSet domestic hot water DHW operation Operating information GeneralHow the boiler operates How the control module operatesTemperature control Protection featuresBoiler temperature regulation Outdoor reset operation, if used CascadeSequence of operation Operation DisplayAccess modes InstallerUser Knight wall mount boiler control module 1Control PanelCall for Heat Operating information Dial Function Maintenance Maintenance and annual startup Service technicianOwner maintenance Maintenance Check ignition ground wiring Check all boiler wiringCheck control settings Check expansion tankCheck flame signal Cleaning boiler heat exchangerReview with owner Heat Exchanger Cleaning Kits Oiled bearing circulatorsDiagrams PC Interface2Wiring Diagram