Lochinvar 51-211 operation manual Final checks before starting the boiler, Start the boiler

Page 59

10 Start-up(continued)

Final checks before starting the boiler

Read the Knight Wall Mount Service Manual to

familiarize yourself with SMART SYSTEM control

module operation. Read this manual, page 60 for proper

steps to start boiler.

Verify the boiler and system are full of water and all

system components are correctly set for operation.

Verify the preparation procedures of Section 10, pages 57

and 58 have been completed.

Fill the vent condensate trap with water (removing the

retaining screw in order to remove the 2 inch PVC cap

Installation & Operation Manual

Check vent piping and air piping

1.Check for gastight seal at every connection, seam of air piping, and vent piping.

￿WARNING Venting system must be sealed gastight to prevent flue gas spillage and carbon

monoxide emissions, which will result in severe personal injury or death.

Check gas piping

1.Check around the boiler for gas odor following the procedure on page 48 of this manual (connecting gas supply piping).

with the switch located at the top of the trap). Replace

the cap. Press the cap onto the trap until the cap makes

contact with the drain. Replace the retaining screw.

Verify electrical connections are correct and securely

attached.

Inspect vent piping and air piping for signs of deterioration

￿WARNING

If you discover evidence of any gas leak, shut down the boiler at once. Find the leak source with a bubble test and repair immediately. Do not start the boiler again until corrected. Failure to comply could result in severe personal injury, death, or substantial property damage.

from corrosion, physical damage or sagging. Verify air

piping and vent piping are intact and correctly installed

per this manual.

Propane boilers – verify conversion

1.Verify propane conversion has been completed per the Propane Conversion instructions.

Start the boiler

1.Read and follow the Operating instructions in FIG. 10-2, page 60.

If boiler does not start correctly

1.

Check for loose connections, blown fuse or service switch

 

off?

2.

Is boiler water temperature above 200°F?

￿WARNING

DO NOT adjust gas valve outlet pressure. The gas valve is factory-set for the correct outlet pressure. This setting is suitable for natural gas and propane, requiring no field adjustment. Attempting to alter the gas valve outlet pressure could result in damage to the valve, causing potential severe personal injury, death, or substantial property damage.

3.

Is thermostat set below room temperature?

4.

Is gas turned on at meter or boiler?

5.

Is incoming gas pressure less than 4 inches w.c.?

If none of the above corrects the problem, refer to the Troubleshooting Section of the Knight Wall Mount Service Manual.

Check system and boiler

￿WARNING

Knight wall mount boilers are typically shipped ready to fire on natural gas. Check boiler rating plate to determine which fuel the boiler is set for. If set to natural gas, it may be converted to LP by installing an orifice (see page 13). In order to operate on LP gas, an orifice MUST BE installed. Failure to comply could result in severe personal injury, death, or substantial property damage.

Check water piping

1.Check system piping for leaks. If found, shut down the boiler and repair immediately. (See WARNINGS on pages 57 and 58 (startup) regarding failure to repair leaks.)

2.Vent any remaining air from the system using manual vents. Air in the system will interfere with circulation and cause heat distribution problems and noise.

Check flame and combustion

1.Turn the main power off to the boiler.

2.Remove the flue temperature sensor from the flue pipe connection. Note: Combustion measurements will be made at this point.

3.Turn the main power on to the boiler.

59

Image 59
Contents Models 51 Contents Please read before proceeding When servicing boilerStainless steel heat exchanger Gas connection pipe Knight Wall Mount Boiler How it worksModels 51 Knight Wall Mount Boiler Ahri Rating RatingsBefore locating the boiler, check Installation must comply withCloset and alcove installations Determine boiler location1Closet Installation Minimum Required Clearances Prevent combustion air contamination PrecautionsVent and air piping Wall mounting locationAreas likely to have contaminants When using an existing vent system to install a new boilerProducts to avoid When removing a boiler from existing common vent system Gas conversions Prepare boilerRemove boiler from wood pallet Mounting to a metal studded wall Mounting the boilerMounting to a wood studded wall Mounting to a concrete wallDirect venting options Vertical Vent General ventingDirect venting options Sidewall Vent Air intake/vent connections Install vent and combustion air pipingLength Requirements for installation in CanadaSizing Air inlet pipe materials MaterialsModel Kit Number Optional room airAir contamination Primer Material StandardVent fittings Centrotherm InnoFlue SW PolypropyleneFlue Intake Air Adapter Termination Stainless steel ventApproved Stainless Steel Vent Manufacturers Make Model FlueDetermine location If using the alternate sidewall terminationSidewall direct venting Vent/air termination sidewall2AClearance to Gravity Air Inlets Prepare wall penetrations Alternate Field Supplied Option Prepare wall penetrations5AMultiple Vent Terminations must also comply with -1A Multiple vent/air terminationsDescription and usage Sidewall termination installationSidewall termination optional concentric vent Sidewall termination optional concentric vent models 8Concentric Vent Dimensional DrawingMultiventing sidewall terminations 10Concentric Vent Sidewall AttachmentVent/air termination vertical Vertical direct venting2Vertical Terminations with Multiple Boilers Prepare roof penetrationsVertical termination optional concentric vent Vertical termination installationMinimum Combustion AIR Typical Multiventing vertical terminationsConcentric Venting Arrangement Alternate vertical concentric ventingAIR Inlet Flue Exhaust Seal CAP Existing Flue Outlet Existing vent as a chaseChilled water system Hydronic pipingSystem water piping methods General piping information Low water cutoff deviceNear boiler piping components Circulator sizing Near boiler piping connectionsArmstrong Pump Size GrundfosUP26-96 FC/VS IFC VS Stratos 1.25 3 x Smart System / Multi-temperature loop control optionVariable speed pump setup Variable speed pump option3Single Boiler Single Temperature Zoned with Circulators Number of Units 5Single Boiler Multiple Temperatures Required Pipe Sizes Model 8Single Boiler Zoned with Valves Model Number of Units 10Single Boiler Non-Zoned Primary/Secondary Piping Gas connections Connecting gas supply pipingPropane Gas Natural gasLength of Pipe in Straight Feet for 1/2 PSI Natural Gas Pipe Capacity ChartCheck inlet gas supply Gas Pressure Gas valve replacementLow voltage connections Field wiringInstallation must comply with Line voltage connectionsThermostat Outdoor temperature sensorLouver proving switch Flow switchBoiler management system Alarm contactsWiring of the cascade System supply sensor4Low Voltage Field Wiring Connections Condensate drain Condensate disposalFill and test water system Freeze protection when usedStart-up Check/control water chemistryInspect/check condensate lines and fittings Clean/Inspect Trap AssemblyCheck for gas leaks Check thermostat circuits Inspect/fill condensate systemCheck system and boiler Final checks before starting the boilerStart the boiler If boiler does not start correctly2Operating Instructions Natural Gas Propane Set space heating operationSet domestic hot water DHW operation Verify DHW modeConfiguration of the cascade How the control module operates Operating informationGeneral How the boiler operatesProtection features Temperature controlBoiler temperature regulation Cascade Outdoor reset operation, if usedOperation Display Sequence of operationUser Access modesInstaller 1Control Panel Knight wall mount boiler control moduleCall for Heat Operating information Dial Function Owner maintenance Maintenance Maintenance and annual startupService technician Maintenance Check expansion tank Check ignition ground wiringCheck all boiler wiring Check control settingsReview with owner Check flame signalCleaning boiler heat exchanger Oiled bearing circulators Heat Exchanger Cleaning KitsPC Interface Diagrams2Wiring Diagram