Installation & Operation Manual
1 Determine boiler location
Figure 1-1 Closet Installation - Minimum Required Clearances
LEFT | TOP | WARNING |
6" MINIMUM | ||
24" SERVICE |
|
|
0" MINIMUM | VENTILATING* | |
| ||
| AIR OPENING |
For closet installations, CPVC or stainless steel vent material MUST BE used in a closet structure due to elevated temperatures. Failure to follow this warning could result in fire, personal injury, or death.
1" MINIMUM CLEARANCE AROUND VENT PIPE
BOTTOM
24" SERVICE 0" MINIMUM
6"
RIGHT
0" MINIMUM
CLOSED DOOR
6"
VENTILATING*
AIR OPENING
FRONT
24" SERVICE
6" MINIMUM
1/4" MINIMUM CLEARANCE AROUND HOT WATER PIPES
*AREA OF EACH OPENING: | Note: Service clearances are recommendations | ||
|
|
| |
1 SQ. INCH PER 1000 BTU PER HOUR INPUT | |||
WITH A MINIMUM OF 100 SQ. INCHES. | only. |
Figure 1-2 Alcove Installation - Minimum Required Clearances
LEFT
24" SERVICE 0" MINIMUM
1" MINIMUM CLEARANCE AROUND VENT PIPE
TOP
6" MINIMUM
WARNING For alcove installations, CPVC or stainless steel vent material MUST
BE used in an alcove structure due to elevated temperatures. Failure to follow this warning could result in fire, personal injury, or death.
RIGHT
0" MINIMUM
OPEN FRONT
| FRONT |
| 24" SERVICE |
BOTTOM | 6" MINIMUM |
24" SERVICE |
|
0" MINIMUM |
|
Note: Service clearances are recommendations only. | 1/4" MINIMUM CLEARANCE |
AROUND HOT WATER PIPES |
8