Burnham 101008-01R1-2/07 manual Summary of Horizontal Venting Options, Or PVC

Page 14

TABLE 7.1: SUMMARY OF HORIZONTAL VENTING OPTIONS

VENT OPTION #

CLASSIFICATION USED IN THIS MANUAL

ILLUSTRATED IN FIGURE

VENT PIPE STRUCTURE PENETRATION

AIR INTAKE PIPE STRUCTURE PENETRATION

VENT PIPE SIZE

AIR INTAKE PIPE SIZE

LENGTH

VENT

FCM070

FCM090

 

 

MAXIMUM

INLET

FCM120

FCM070

 

 

 

 

FCM090

 

 

FCM120

LENGTH

VENT

FCM070

FCM090

 

 

MINIMUM

INLET

FCM120

FCM070

 

 

 

 

FCM090

 

 

FCM120

VENT TERMINAL

AIR INTAKE TERMINAL

VENT MATERIAL

AIR INTAKE MATERIAL

1

2

3

4

HORIZONTAL

HORIZONTAL

(RESERVED

(RESERVED FOR

FOR FUTURE

CONCENTRIC

TWIN PIPE

FUTURE USE)

USE)

 

 

 

7.27.3

WALLWALL

WALL

WALL

60/100 mm

3”

 

CONCENTRIC

3”

 

32ft

55ft

32ft

55ft

18ft

55ft

32ft

55ft

32ft

55ft

18ft

55ft

10in

2ft

10in

2ft

10in

2ft

10in

2ft

10in

2ft

10in

2ft

60/100 mm

P/N 8110701

 

CONCENTRIC

3” 90 ELBOW

 

U.S. Boiler

APPROVED

STAINLESS

60/100mm

STEEL VENT

VENT

SYSTEM

COMPONENTS

SHOWN IN

SHOWN IN

TABLE 7.5

TABLE 7.4

GALVANIZED

(Note #1)

OR PVC

 

Note #1: The 80/125mm concentric straight section (P/N 101162-01) shown in Table 7.4 may be used between the boiler and the first 80/125 x 60/100 reducing

elbow. If this is done, the overall maximum vent length is still restricted to that shown for Vent Option #1 in Table 7.1 above.

14

Image 14
Contents Freedom Table of Contents II Specifications SpecificationsProduct Description Maximum Vent LengthsIII Before Installing IV Locating the BoilerClearances To Combustible Or Non-combustible Material Clearances from Vent Piping to Combustible Construction Floor Mounting Mounting The BoilerWall Mounting Wall Mounting Hole Locations Boiler Mounting/Hardware VI Air for Ventilation Page VII Venting Vent System DesignPage Summary of Horizontal Venting Options Or PVCHorizontal Concentric Venting Vent Option U.S. Boiler Concentric Vent Components Vent Option Size Vent6c Positioning Vent Terminal Under Overhangs VENT/ AIR Intake Fitting Equivalent Length Summary of Vertical Venting Options RoofRemoving an Existing Boiler From a Common Chimney Never Common Vent a FCM Boiler with Other AppliancesAssembly of U.S. Boiler 60/100mm Concentric Venting 11 Dimension L 12 Cutting Outer Pipe 14 Preparing Terminal Section for Installation in the Wall Assembly of Stainless Steel Venting 16 Installation of Stainless Steel Vent Collar17a Star-34 Connection to Vent Collar 18 Z-Vent III Connection to Vent Collar 19 SAF-T Vent EZ Seal Connection to Vent Collar 20 FasNSeal Connection to Vent Collar Condensate Trap and Drain Line 21 Condensate Piping Arrangement Viii Gas Piping Gas Connection To BoilerSystem Design General System Piping PrecautionsIX System Piping Flow Requirements Through BoilerMethod 1 Primary/Secondary Piping Piping Method #1 Heat Only Piping Method #1 Heat + Indirect Water Heater 4b Piping Method #1 Indirect Water Heater Loop Piping Shaded Pipe and Circulator Sizing for Boiler Loop Pipe and Circulator Sizing for Indirect Water Heater LoopFitting Equivalent Lengths Standard Piping Installation Requirements Boiler Head LossPiping for Special Situations 11 Chiller Piping Wiring Wiring Connections Diagram Ladder Diagram Page XI Start-up and Checkout Never Attempt to Fill a HOT Empty BoilerWater Quality and Boiler Water Additives FCM Series Lighting and Operating Instructions SWT Gas Valve Detail Typical CO2/O2 Combustion Readings RangePage Normal Display In Standby Mode XII OperationPage Basic Menu Tree Boiler Status First Digit Boiler StatusOutdoor Reset Curve XIII. Service and Maintenance Page XIV. Troubleshooting No Error Code DisplayedSoft Lockout Codes Displayed Code Condition Possible CausesHard Lockout Codes Displayed XV Parts Page Parts List KEY DescriptionPage Parts List Page Page Page DISP4D 150 151 152 153 154 155 156 157 158 159 160 161 162 Page Page Page Page Page Limited Warranty