Burnham
101008-01R1-2/07
manual
Dimension L
Troubleshooting
Specs
Install
Parts list
Wiring Connections Diagram
Wiring
Warranty
Dimension
Maintenance
Outdoor Reset Curve
Page 22
Figure 7.10: Installation of Reducing Elbow on Concentric Boiler Collar
Figure 7.11: Dimension “L”
22
Page 21
Page 23
Image 22
Page 21
Page 23
Contents
Freedom
Table of Contents
II Specifications
Specifications
Product Description
Maximum Vent Lengths
III Before Installing
IV Locating the Boiler
Clearances To Combustible Or Non-combustible Material
Clearances from Vent Piping to Combustible Construction
Wall Mounting
Mounting The Boiler
Floor Mounting
Wall Mounting Hole Locations
Boiler Mounting/Hardware
VI Air for Ventilation
Page
VII Venting
Vent System Design
Page
Summary of Horizontal Venting Options
Or PVC
Horizontal Concentric Venting Vent Option
U.S. Boiler Concentric Vent Components Vent Option
Size Vent
6c Positioning Vent Terminal Under Overhangs
VENT/ AIR Intake Fitting Equivalent Length
Summary of Vertical Venting Options
Roof
Removing an Existing Boiler From a Common Chimney
Never Common Vent a FCM Boiler with Other Appliances
Assembly of U.S. Boiler 60/100mm Concentric Venting
11 Dimension L
12 Cutting Outer Pipe
14 Preparing Terminal Section for Installation in the Wall
Assembly of Stainless Steel Venting
16 Installation of Stainless Steel Vent Collar
17a Star-34 Connection to Vent Collar
18 Z-Vent III Connection to Vent Collar
19 SAF-T Vent EZ Seal Connection to Vent Collar
20 FasNSeal Connection to Vent Collar
Condensate Trap and Drain Line
21 Condensate Piping Arrangement
Viii Gas Piping
Gas Connection To Boiler
System Design
General System Piping Precautions
IX System Piping
Flow Requirements Through Boiler
Method 1 Primary/Secondary Piping
Piping Method #1 Heat Only
Piping Method #1 Heat + Indirect Water Heater
4b Piping Method #1 Indirect Water Heater Loop Piping Shaded
Pipe and Circulator Sizing for Boiler Loop
Pipe and Circulator Sizing for Indirect Water Heater Loop
Fitting Equivalent Lengths
Standard Piping Installation Requirements
Boiler Head Loss
Piping for Special Situations
11 Chiller Piping
Wiring
Wiring Connections Diagram
Ladder Diagram
Page
XI Start-up and Checkout
Never Attempt to Fill a HOT Empty Boiler
Water Quality and Boiler Water Additives
FCM Series Lighting and Operating Instructions
SWT
Gas Valve Detail
Typical CO2/O2 Combustion Readings Range
Page
Normal Display In Standby Mode
XII Operation
Page
Basic Menu Tree
Boiler Status
First Digit Boiler Status
Outdoor Reset Curve
XIII. Service and Maintenance
Page
XIV. Troubleshooting
No Error Code Displayed
Soft Lockout Codes Displayed
Code Condition Possible Causes
Hard Lockout Codes Displayed
XV Parts
Page
Parts List
KEY Description
Page
Parts List
Page
Page
Page
DISP4D
150 151 152 153 154 155
156 157 158 159 160 161
162
Page
Page
Page
Page
Page
Limited Warranty
Related pages
All Dimension page
Physical Dimension for Compex Technologies NP25G 6C
Building-in dimensions for Miele F 456 i-3
Part Names Dimensions unit mm for SMC Networks EX9-OET1 EX9-OEP1
CMA-105 Dimensions for Chief Manufacturing CMA-115
Physical Dimensions for Field Controls 10
Dimensions for Lightolier VRA2G16LS26U
Dimensions for Edimax Technology ES-516G+
Dimensions for Panasonic DMC-FP8
Dimensions for SoundCraft D-Mix 500
Dimensions for Panasonic PT-FW100NTE
What are the features of the Craftsman 79240?
Explore features
Top
Page
Image
Contents